It is essential that the installation is carried out in the order given
below to ensure the correct operation of the system.
Checklist
Please do not hesitate to call for advice on the
following numbers:
0161 233 0600 office hours
Or out of hours call:
07843 355163 UK only
Notes.
It is recommended that all systems are commissioned after installation by Medem UK. This will extend the warranty period from 5
years to 10 years on the main panel and ensure the system is working as designed.
Please see warranty conditions that came with the main panel.
The panel and any installed detectors should be tested every 12 months as a minimum with consideration to 6 months dependent
on environment.
Medem offer cost effective yearly service plan options which include detector exchange to assist in service budgeting.
AGDS-2em v2
First read the system description sheet before following the
instructions below
1.
Connect the gas valve to the marked terminals “VALVE & EARTH”
.
2.
Connect any additional EM stop buttons or thermal links in series to the terminals marked “EM STOP” (
8
)
3.
Each detector has a rotary address switch, each switch should be set to a different number 1-2. Then connect the
gas detectors to terminals marked “DETETORS” (
6
) on the panel. Detectors are wired in parallel. “Daisy chain”
4.
Connect the fire alarm input to the terminals marked “FAP”., Ensure volt free n/c (
7
)
5.
Ensure any BMS connections are made to the ‘BMS1 Relay’ (
4
) and preferred output operation is set (
12
)
6.
Connect the 3 amp fused spur 240 volt supply to marked terminals.
7.
Once power is connected to the panel a correctly addressed and wired detector will flash a green LED for 90
seconds after which the LED will be continuously green.
8.
Press the “learn dets” button (
10
) this is on the main circuit board on the right hand side, just over half way up the
board, pressing this once allows the panel to learn how many and which type of detectors are fitted. A learnt
detector will be shown by a green ‘Detectors 1 2’ LED on the panel (it will also be flashing during the 90 second
warm up), if this is not illuminated, check wiring, check detector ID address and relearn.
9.
At this point press the “Reset” button, the panel will open the gas valve and the red ‘Gas On’ LED will be
illuminated .