background image

electromechanical operator for sliding gates

E

n

g

li

sh

Nyota 115 evo

19

h

a

n

d

 o

v

e

to

 t

h

e

 e

n

d

 u

se

o

th

e

 in

st

a

ll

a

ti

o

n

MAINTENANCE RECORD

hand over to the end user of the installation

Installation address:

Installation type:

Sliding gate

Over-head door

1

2

3

4

5

6

Service date

Stamp and signature

installation technician/maintainer

Signed for acceptance

end user

buyer

Technical maintainer

End user/s

Service description

Lateral folding

door

Swinging gate

Folding door

Bollard

.............................

Road barrier

Operator model:

Dimensions per gate leaf:

Weight per gate leaf:

Installation date:

Quantity of models

installed:

Maintainer:

Date:

NOTE WELL:

 this document must record any ordinary and extraordinary services including installation, maintenance, 

repairs and replacements to be made only by using Fadini original spare parts.

This document, for the data included in it, must be made available to authorized inspectors/officers, and a copy of it must 
be handed over the end user/s.

The  installer/maintainer  are  liable  for  the  functionalities  and  safety  features  of  the  installation  only  if  maintenance  is 
carried on by qualified technical people appointed by themselves and agreed upon with the end user/s.

the gate opener

X

Содержание Nyota 115 evo 1-phase 0,5 HP

Страница 1: ...lectromechanical operator for sliding gates up to 1 250 kg 0 5 HP version 1 850 kg 1 0 HP version EN 13241 EN 12453 EN 12445 GB Instructions manual pages 11 20 the gate opener 11 MAGNETIC LIMIT SWITCH...

Страница 2: ...ing off the master switch If removing the actuator do not cut the electric wires but disconnect them from the terminal box by loosening the screws inside the junction box INSTALLATION All installation...

Страница 3: ...he functioning of the Nyota 115 evo gate operator made in It aly www fadini net installatore Data Modello N serie CANCELLO AUTOMATICO l apricancello Position Description Type of electric cable MIRI 4...

Страница 4: ...concrete has firmly set all around the the bracket Nyota 115 evo can be mounted onto it Cover removing unscrew the fastening screw completely Pic 4 then pull at the bottom in order to remove the cover...

Страница 5: ...system is engaged Fix the gear rack modules all along the gate to coincide with the actually required gate travel By means of a spirit level make sure they are well aligned and take also into account...

Страница 6: ...by Elpro 12 evo electronic control board depending on which model has been purchased NOTE WELL the Nyota 115 evo models that are not equipped with either the encoder or the Elpro 12 evo electronic co...

Страница 7: ...TEWELL IT IS FUNDAMENTALTHATTHE GATE DOES NOT RUN INTOTHE GATE STOPSTOO FAST ON OPENING AND CLOSING CYCLES A 30 50 mm CLEARANCE SHOULD BE RECOMMENDED BEFORE THE LIMIT SWITCHES ARE ENGAGED electromecha...

Страница 8: ...ory pre wired as if it were going to be installed on the left In case Nyota Evo is required to be installed on the left swap the connections to terminals 8 10 and 16 18 Magnetic limit switch sensor Ny...

Страница 9: ...model Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including...

Страница 10: ...tomatically operated and remove any possible friction points 80 Nm 1 32 10 m 1 25 C 80 C IP 55 20 kg 1 800 kg very intensive FADINI OIL code 706L 80 Nm 1 32 10 m 1 25 C 80 C IP 55 19 5 kg 1 850 kg ver...

Отзывы: