background image

 
 
 

 

Document No 7214-D0001-01 

 

Mobile Energy Australia Pty Ltd 

39 Dulacca Street, Acacia Ridge QLD 4110 Australia   

 ABN 98 674 578 946 

P: +61 7 3273 6803 

 

E

[email protected]

 

    

www.mobileenergyaustralia.com.au

 

 

5.

 

INSTALLATION

 

 

The compressor is a rotary screw type driven by either a petrol or diesel engine. Compression occurs when 
inlet air (at normal atmospheric pressure) enters a chamber where it is trapped between the rotating rotor 
lobes.  A  lubricated  pitch  line  provides  sealing.  As  the  lobes  mesh,  they  reduce  the  volume  of  the  air 
(compression). 

The system has a two-stage air/oil separator. The first separation stage consists of baffles, which perform 
separation  through  gravity.  The  second  stage  uses  a  special  separation  element  (a  spin-on  coalescing 
filter), which delivers mostly dry oil free air to the outlet.  

A paper-type replaceable air filter is used to filter the air coming into the compressor intake valve. A spin-on 
type  oil  filter  is  used  for  oil  filtration  after  the  oil  passes  through  the  cooler  and  is  returned  to  the 
compressor.   

Pressure regulation is achieved by adjusting the pressure regulator valve mounted on the compressor body 
near the intake valve. The system pressure is set during final testing to 150psi if any air flow is required the 
engine speed will increase to full RPM (+/-3400 RPM) and fill the tank to 150psi. If no air is used the engine 
speed will drop to +/- 1200 RPM and be on standby until more air is required.  

The compressor air intake is protected by a paper-type replaceable air filter, and a spin-on type oil filter for 
the oil side and a coalescing filter for final oil removal from the air. 

Safety features included in the compressor are: 
 

 

150 PSI relief valve in separation manifold, 

 

blow-down valve to discharge system pressure on shutdown,  

 

Over temperature safety sensor in the compressor oil

 

 

Over pressure mounted at the minimum pressure valve,

 

Do not disable or bypass the over-temperature shutdown circuits. Failure of the shutdown system 
could result in equipment damage, injury, or death. 

An oil cooler maintains the operating temperatures in an optimal performance range. This helps to increase 
system durability. 

Mounting the Compressor Unit to Vehicle 

Before  starting  the  installation,  have  a  quick  overview  of  the  requirements.  Some  of  these  points  will  be 
dealt with in more details further on in this text. Things that should be considered before installation begins 
are as follows.  

1. 

The unit should be installed in an open area. 

2. 

The unit needs to be properly secured to the vehicle with rubber isolators and bolted down.  

3. 

The unit must be mounted in such a way that sight level glass for compressor oil level can 
be checked easily. 

4. 

It should be possible to service the unit easily without having to remove and reposition the 
unit. 

5. 

The  unit  should  be  protected  from  excessive  exposure  to  the  elements  and  possible 
incidental damage from other operations. 

6. 

The unit should be installed in an area away from heat sources such as engines, exhaust 
systems or other components that generate heat. 

7. 

The unit should not be installed in a location where it will be exposed to high contamination 
levels or combustible gases. 

Содержание SMARTPACK 35

Страница 1: ...7214 D0001 01 SMARTPACK 35 SP35P SP35D Owners Operators Manual 35CFM Compact Petrol or Diesel Driven Air Compressor Revision 1 Revised 03 12 2018...

Страница 2: ...Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au THIS PAGE IS...

Страница 3: ...Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au MEA Product Warranty Registration Form THIS FORM MUST BE COMP...

Страница 4: ...ountry ___________________ MEA Installer Information Company Name ______________________________________________________________ City _______________ State ___________________ Country ________________...

Страница 5: ...ATIONS 4 4 OPERATING PROCEDURE 5 5 INSTALLATION 7 6 SCHEDULE MAINTENANCE 10 7 SPARE PARTS AND SERVICE KITS 12 8 TROUBLESHOOTING 16 9 DRAWINGS ILLUSTRATIONS 19 10 WARRANTY 35 MOBILE ENERGY AUSTRALIA CO...

Страница 6: ...ate that this is a compulsory process to be carried out on each site These together with site specific safety procedures will help to minimize the risk to accidents personnel injury and loss of life I...

Страница 7: ...nual has important information on the system particularly how to install operate and maintain properly Refer to page seven P 7 for information on installation as a vehicle mounted system Section six 6...

Страница 8: ...nd Inlet Valve Regulation Pneumatic Engine Control System Pneumatic speed control engine and compressor high temperature and pressure engine shutdown system Safety Features Relief valve in compressor...

Страница 9: ...O STARTING EACH DAY 1 Check the oil level in the engine 2 Check the oil level in the compressor 3 Check all hoses are secured and not damaged Replace all damaged hoses before starting 4 Check all elec...

Страница 10: ...the lever on the fuel solenoid is in the downward 3 Turn the key to the right to power the glow plugs wait till glow plug indicator light has gone out continue to turn the key until engine starts the...

Страница 11: ...cted by a paper type replaceable air filter and a spin on type oil filter for the oil side and a coalescing filter for final oil removal from the air Safety features included in the compressor are 150...

Страница 12: ...ust are located outside of the enclosed space The unit generates a considerable amount of heat when running Proper ventilation is vital to good operation and to avoid damage to components due to poor...

Страница 13: ...ecified by the customer and the engine will be at the lower speed idle speed Pressure settings of the unit has been adjusted by the factory to the customer specifications If the pressure is not at the...

Страница 14: ...ck engine oil level Check air filter s and connecting hose and clamps Check for oil and air system including hoses for leaks Every 25 Hours or Monthly Drain water from than and check Compressor oil le...

Страница 15: ...stralia com au Every 500 Hours in case of low use every year Change Engine oil 1 1L In case of low use every year In using lower quality oil change every 150 hours Change engine oil filter Replace fue...

Страница 16: ...bile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au 7 SPARE PARTS...

Страница 17: ...10003 P0005 ISOLATOR RUBBER 2 10004 P0166 AUTO TENSIONER 3 10004 P0155 DRIVEN PULLEY 4 10004 P0156 DRIVER PULLEY 5 10008 P0026 REGULATOR 6 10008 P0041 OIL FILTER 7 10008 P0045 COALESCING FILTER 8 1000...

Страница 18: ...art Number Description Quantity 10019 K0007 OIL 5 LITRE CONTAINER DIESEL 1 10021 P0006 DECAL OIL MEA OIL 1 10008 P0126 FILTER OIL ENGINE KOHLER 1 10008 P0128 FILTER AIR ENGINE KOHLER 1 7201 P0075 DECA...

Страница 19: ...ILTER AIR KOHLER CH440 1 400 Hour Part Number Description Quantity 10021 P0006 DECAL OIL MEA OIL 1 10019 K0007 OIL 5 LITRE CONTAINER DIESEL 1 10019 K0005 OIL 5 LITRE CONTAINER COMPRESSOR 1 7201 P0075...

Страница 20: ...does not open 2 Check the valve If necessary replace the damaged parts with the spare parts kit 3 Air loss from safety valve 3 Replace the valve Compressor keeps on loading over working pressure safet...

Страница 21: ...port 2 Insufficient lubrication 2 Call MEA technical support Presence of oil in the outlet of minimum pressure valve 1 Separator filter damaged 1 Replace the separator filter 2 Oil recovery viewer obs...

Страница 22: ...ctor not adjusted Extra fuel control level sticking 6 White smoke Excessive idle operation Incomplete run in Incorrect injection timing Rings worn or sticking Worn cylinder Fuel filter clogged White S...

Страница 23: ...y Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au 9 DRAWINGS ILLUSTRATIONS...

Страница 24: ...Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au GA DRAWING O...

Страница 25: ...21 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au GA DRAWIN...

Страница 26: ...Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au GA DRAWING...

Страница 27: ...23 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au GA DRAWI...

Страница 28: ...24 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au GA DRAWI...

Страница 29: ...25 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au GA DRAWIN...

Страница 30: ...bile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au GA DRAWING OLD...

Страница 31: ...01 27 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au V61 C...

Страница 32: ...KSMART HYDRAULIC DIAGRAM 1 oil return from separator 2 Intake valve 4 Screw air end 5 Oil cooler 6 Thermostatic valve 7 Safety valve 8 Air oil separator tank 9 Minimum pressure valve 10 Switch load no...

Страница 33: ...29 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au ENGINE C...

Страница 34: ...Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au FURTHER INFORMATIO...

Страница 35: ...Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au ENGINE COMPONENTS OVERVIEW DIESEL F...

Страница 36: ...Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au KOHLER ENGI...

Страница 37: ...33 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au KOHLER E...

Страница 38: ...D0001 01 34 Mobile Energy Australia Pty Ltd 39 Dulacca Street Acacia Ridge QLD 4110 Australia ABN 98 674 578 946 P 61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au...

Страница 39: ...s 2 5 Consequential damages caused by product s failure 2 6 Any product s if other than MEA s genuine components are used in the product s 2 7 Normal wear and tear of product s 3 WARRANTY PERIOD 3 1 T...

Страница 40: ...s to validate the warranty No warranty claims will be processed unless MEA has received a fully completed warranty registration form 7 DISCLAIMER AND WARRANTY SERVICE 7 1 Any labour costs claimed more...

Страница 41: ...61 7 3273 6803 E sales mobileenergyaustralia com au www mobileenergyaustralia com au MOBILE ENERGY AUSTRALIA CONTACTS Sales Email sales mobileenergyaustralia com au Office 07 3273 6803 Spare Parts Of...

Отзывы: