manualshive.com logo in svg
background image

 
 
 
 
 
 
 
 
 
 
 
 
 
 

VISION FLX

2

 

MANUAL 

 

 

 
 

 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AUG 22, 2016 

                                                                       

833-083 

Содержание VISION FLX2

Страница 1: ...VISION FLX2 MANUAL AUG 22 2016 833 083...

Страница 2: ...direction of the cable path Connect the black end of the direct connection cables to the ground stake Connect the red end of the direct connection cables on the cable to be checked Power on Press Fre...

Страница 3: ...he direct connection cables to the ground stake Connect the red end of the direct connection cables on the cable to be checked Power on Press Frequency and select FF Press ADJUST Resistance is indicat...

Страница 4: ...cable Press and hold the Gain Select key for one second this will adjust the sensitivity of the Receiver and display 70 0 If the Receiver displays OVER manually reduce the output on the Transmitter u...

Страница 5: ...e A frame in the earth every five to ten feet Note If LCD does not display arrow or signal strength A frame is not reading signal The A frame may not be making contact with earth or signal is too weak...

Страница 6: ...point will be in the center of the A frame CONFIRM THE FAULT LOCATION Turn the A frame 90 degrees perpendicular to the cable path Place the A frame in the earth and follow the direction the arrows ar...

Страница 7: ...he red leg Multiple Faults Place both legs of the A frame in the ground with the red leg directly over the fault point With a line that has multiple faults the fault that registers the highest reading...

Страница 8: ...rection of the arrow and measure the location of the cable When going back to Fault finding mode press Peak Null again The direction of the object line Receiving level No bar graph Yaw angle Real time...

Отзывы: