TEST RECORD SHEET for McKENZIE-MARTIN LIMITED
MACKRIDGE/KENSTACK ROOF VENTILATORS
DATE
HOW OPERATED
RESULT
DETAILS OF FAILURE
SIGNATURE
Страница 1: ...TORS NATURAL ROOF VENTILATORS OPERATION SERVICE AND MAINTENANCE SCHEDULE McKENZIE MARTIN LIMITED ETON HILL WORKS ETON HILL ROAD RADCLIFFE MANCHESTER M26 2US TEL 0161 723 2234 FAX 0161 725 9531 E MAIL...
Страница 2: ...tch to the close position This will re activate the magnet contained in the motor and the motor will activate and rewind the control cable to close the damper The motor will stop turning when the cont...
Страница 3: ...ribed under the close test heading MANUALLY OPERATED CLAM CLEAT TO OPEN Pull cord cable in a downwards and outwards direction to disengage the clam cleat cable grip and release the cable to open the d...
Страница 4: ...POLYESTER POWDER COATINGS PPC products should under NO CIRCUMSTANCES be cleaned using abrasive cleaners strong solvents strong alkali or acid material or cutting and abrasive polishes The coated produ...
Страница 5: ...TEST RECORD SHEET for McKENZIE MARTIN LIMITED MACKRIDGE KENSTACK ROOF VENTILATORS DATE HOW OPERATED RESULT DETAILS OF FAILURE SIGNATURE...
Страница 6: ...ible link etc SERVICE DETAILS The system has been serviced in accordance with McKENZIE MARTIN SERVICE MAINTENANCE SCHEDULE in addition the following work has been carried out REPAIRS AND MODIFICATIONS...