
5
Installation Tools
Installation Requirements
MCI SynAIRgPure
TM
16K
Return Plenum
(Recommended Option)
Utility Knife
Tin Snips
Phillips Head Screwdriver
Power Drill/Driver
3/8” Drill Bit
DBI Mounting Bracket
(Optional Addition)
12V DC Splitter Cable
(Optional Addition)
The MCI
TM
Unit should be installed after
the air handler in the HVAC system in
the supply plenum .*
*Another MCI SynAIRgPure
TM
16K is recommended in the
Return Plenum for additional protection and to keep the
internal parts clean.
An approximate opening of
3” W x 5” H will
need to be cut into the existing duct work
to install the unit properly .
Electrical Requirements
The unit comes with a 100-240V Power
Adapter providing flexibility of placement .
The adapter comes with a 120V plug with
ground . Locate the unit within 6 ft . of a standard 120V ground outlet .
WARNING:
Long term use of an extension cord is not recommended due to safety considerations .
MCI SynAIRgPure
TM
16K
Supply Plenum