background image

SPECIFICATIONS

Maximum Pressure: 150 psi (10.5 kg/cm

2

)

2

FEATURES

Burner Delay (DOB): 0 to 60 seconds (Field Adjustable)

Ambient Temp: 120˚F Max.

NOTE: The circuit board is protected with a sensor which will
shut down the unit if the temperature at the board exceeds
176˚F (80˚C). The board will reset when the temperature at
the board drops below 167˚F (75˚C).

Burner Relay Time Delay
There is a field-adjustable time delay (DOB) to 
prevent nuisance burner shut-down. The number 
of seconds water needs to be off the bottom probe
before the burner relay is deactivated can be set
between 0 and 60 seconds.

Redundant Low Water Cut-Off
When the boiler water drops below the middle
probe, a 3 minute timing circuit will be activated. If
water does not return to the middle probe within
three minutes, the burner relay will deactivate. The
Red LED will flash once every second if this
condition occurs.

• Automatic Reset units will automatically reset 

when the water level is restored to the middle 
probe.

• The reset button on Manual Reset units will 

have to be pressed after water is restored to 
the middle probe.

NOTE: The timing circuit will automatically reset 
if the water level is restored to the middle probe
within 3 minutes.

Redundant Pump Off
The pump relay will be activated after water drops
below the middle probe. If the water level is not
restored to the top probe within 3 minutes the pump
relay will be deactivated. After the pump relay is
deactivated, normal operation is resumed. Water
must again drop off the middle probe to activate the
pump relay. There is no LED signal for this 
occurance.

CSD-1 Code Compliance
On Manual Reset units, if the control is in a low
water condition (burner relay deactivated) prior to
an interruption of power, the control will remain in a
low water condition when power is restored. The
reset button will need to be pressed when the water
level again covers the middle probe.

Adjustable Pump Differentials

ELECTRICAL RATINGS & SWITCH RATINGS

Supply

Probe

Full Load (Amps)

Locked Rotor (Amps)

Pilot Duty (VA)

Motor (HP)

Voltage

Voltage

NO (NC), VAC

NO (NC), VAC

NO (NC), VAC

NO (NC), VAC

120 VAC

5 VAC

16  (5.8), 120

96   (34.8), 120

470 (290), 120

1     (1/4), 120

50/60 HZ

maximum

8    (2.9), 240

48   (17.4), 240

470 (290), 240

1     (1/4), 240

Содержание 150E Series

Страница 1: ...and the pressure must be 0 psi 0 bar before servicing To prevent electrical shock turn off the electrical power before making electrical connections This low water cut off must be installed in series...

Страница 2: ...anual Reset units will have to be pressed after water is restored to the middle probe NOTE The timing circuit will automatically reset if the water level is restored to the middle probe within 3 minut...

Страница 3: ...uit is broken which will deacti vate the burner relay When the water level is restored to the middle probe the burner relay will be activated for auto reset controls only SWITCH SETTINGS Values are 3...

Страница 4: ...on at Which the Low Water Cut Off Pump Controller Must be Installed INSTALLATION TOOLS NEEDED Two 2 pipe wrenches one 1 flatblade screw driver and pipe sealing compound IMPORTANT Follow the boiler man...

Страница 5: ...as determined in Step 1 Install blow down valves directly below the lower cross of the water equalizing pipe F STEP 2 Installing the Low Water Cut Off J H a Install a water column H not included with...

Страница 6: ...H BCOM BNC BNO PCOM PNC PNO N H 60 30 Secs 0 60 30 Secs 0 B Probe Wires B Control Box B B Disconnect probe wires red blue yellow from circuit board Remove 4 screws B connecting control box to bracket...

Страница 7: ...probes Cover Plate Brackets C C C C C C Offset Connector Remove 6 screws C connecting brackets and cover plate to probe housing Remove offset connector from cover plate 7 Only loosen upper nut to remo...

Страница 8: ...must be within 25 feet of Control Box NOTE Refer to and follow local codes and standards when selecting conduit and electrical fittings Wires from Probe Housing to Control Box must be in their own co...

Страница 9: ...cover plate Proceed to Electrical Wiring Section to complete wiring to Burner and Pump Valve circuits Wire connections at Probes 1 4 Ring Terminal and Control Panel 22 18 Female Spade must be made wit...

Страница 10: ...tallation Procedure a To remove cover use a flatblade screwdriver to loosen screws and remove the cover K b To reconnect cover slide over brackets and tighten screws using a flatblade screwdriver c Fo...

Страница 11: ...NC PNO N H f e d c b a Connect wire a from power supply to terminal H Connect wire b from neutral supply to terminal N Connect wire c from pump 1 control circuit to terminal PNO Connect wire d from pu...

Страница 12: ...ery 1 2 second The PCB is too hot and the unit has shut down The unit will automatically restart when the PCB has cooled sufficiently When using the TEST button the green light will flash once per sec...

Страница 13: ...C PNO N H 60 30 Secs 0 60 30 Secs 0 BCOM BNC BNO PCOM PNC PNO N H 0 60 30 Secs 0 Probe Connections Bottom Red Middle Yellow Top Blue 0 60 Second Adjustable Burner Off Delay 110Volt Input from Boiler C...

Страница 14: ...obes may be fouled with dirt scale or rust Remove head assembly to inspect probes The wiring connections for the pump may not be connected properly Check wiring at terminals Burner does not turn off w...

Страница 15: ...harge Failure to follow this caution could cause personal injury CAUTION MAINTENANCE SCHEDULE Blow down control as follows when boiler is in operation Daily if operating pressure is above 15 psi Weekl...

Страница 16: ...3500 N Spaulding Avenue Chicago Illinois 60618 tel 773 267 1600 fax 773 267 0991 www mcdonnellmiller com 2002 ITT Industries Inc Printed in U S A 2 02 210496...

Отзывы: