background image

5

AIR  MOTOR

fig. 2

30

36

18

35

34

19

20

17

31

16

14

26

9

7

28

22

4

21

23

13

32

33

29

15

11

10

8

25

6

12

5

24

25

27

3

1

2

CYLINDER CAP NUT
O-RING
CYLINDER
TOGGLE  PIN
AIR VALVE BAR
SHUTTLE
TRIP ROD
BOLT
SPRING CLIP
PISTON
STEM VALVES
O-RING
AIR PISTON TUBE
O-RING
GASKET
O-RING
PLATE
AIR MOTOR BASE
BOLT
BOLT
ROCKER ARM
SPRING
TOGGLE  ARM
LOCKWIRE
ADJUSTING NUT
ROLL PIN
GROMMET
PUPPET RUBBER VALVE
SPRING WASHER
COUPLER
QUICK DETACH COUPLER
TTHROAT PACKING NUT
BEARING
PACKING
GLAND
PLATE

1
2
3
4
5
6
7
8
9

10

11

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

40006
40007
40008

40011

40005
40010
40009
40032
40023
40015
40003
40016

5040020

40017
40019
40018
40218
40022
40055
40132
40014
40013
40012
40002
40004
40029
40098
40001
40228
40053
40054
40021

5040025

40026

5040056

40217

1
1
1
2
1
1
1
2
2
1
2
1
1
1
1
1
1
1
6

12

2
2
2
2
4
1
2
2
2
1
1
1
1
5
1
1

REF.

DESCRIPTION

Q

Содержание BUD G50/200

Страница 1: ...Phone 34 945 132744 Fax 34 945 134756 01006 VITORIA Alava SPAIN P O BOX 3144 HYDRAULIC RATIO 50 1 MODELS BUD G50 200 This instruction manual contains IMPORTANT WARNINGSAND INSTRUCTIONTHATMUST BE READ...

Страница 2: ...Air Coupler c FluidOutlet Connector 3 Operation a JointtheairlineintoAirCoupler b If useAir Pressure Regulator set the pressure within5 8 kg sq cm 70 115 psi and will get 250 400kg sq cm 3500 5750 psi...

Страница 3: ...splacementTube II When Pumpfails to run A Continuous airleakagefrom exhaust CheckAir Motor Check 24 fig 2 Lockwire 11 fig 2 StemValve 25 fig 2 Adjusting Nut 28 fig 2 Puppet RubberValve 12 fig 2 O ring...

Страница 4: ...inder to the base and carefully pull 3 Cylinder Straight up off 10 Piston Unscrew nut 5 16 18 UNC off 7 Trip Rod then screw 1 Cylinder Cap Nut in 7 Trip Rod Press 1 Cylinder Cap Nut push down on 6 Shu...

Страница 5: ...TING NUT ROLLPIN GROMMET PUPPETRUBBERVALVE SPRINGWASHER COUPLER QUICK DETACH COUPLER TTHROAT PACKING NUT BEARING PACKING GLAND PLATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2...

Страница 6: ...SHER PACKING GUIDE PAKING CHECKVALVEPACKINGRETAINER PACKING DISPLACEMENT TUBE PACKING RETAINER PRIMING PLUNGER PRIMING TUBE VALVESEAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 80030 40029 40027...

Страница 7: ...cement of the equipment Such liability is limited to the amount of the original purchase price paid for the unit minus a reasonable deduction for the time the unit has been in service It is the respon...

Отзывы: