Maytag MFS25 Скачать руководство пользователя страница 15

14

INSTALLATION AND MAINTENANCE MANUAL

PUBLICATION DATE  Sep 05    100646

4.5.5. CHECKING ROTATION DIRECTION

CHECK IF THE DRUM ROTATES FROM THE FRONT VIEW IN CLOCKWISE DIRECTION DURING
EXTRACTION. IF IT ROTATES IN OPPOSITE DIRECTION, DISCONNECT TWO PHASES
OF THE CONNECTION FROM THE FREQUENCY INVERTER TO THE MOTOR , SWITCH THEM OVER
AND CHECK AGAIN THE ROTATION DIRECTION.

Fig. 4.5.C. Spin direction

4.5.6. MULTIPLE MACHINES IN LINE SIMPLE PHASE

When multiple single phase machines are connected to the same electrical network, it is necessary to connect
the machines according to fig. 4.5.D. The phase of the frequency control and motor which is connected
to the terminal inside the machine, has to be connected alternatively for the first machine with the first phase
L1 of the network, the second machine with the second phase L2, ... The fourth machine must again be
connected to the first phase L1. This assures a better load of the electrical network.

Fig. 4.5.D. Multiple machines in line

4.6. CONNECTION OF WATER SUPPLIES

WATER CONNECTION

WATER HARDNESS

It is advisable to contact the water supplier for information concerning the properties of the water in your
area. Good wash results are dependent also on the water hardness. For medium to very hard water,
consideration should be made to make the water softer.
Only in some cases is the use of hard water desirable, such as adding softener in the linen.
The soap supplier can help you with making the right decisions concerning hard water, soft water, washing
programs, type of soap and other related items to have the best wash results.

Characteristics

mmol / dm

3

dH -

Germany

fH -

France

England

gr/gal

USA

soft

0 - 1,25

0 - 7°

0 - 12°

0 - 8,75°

0 - 3

medium

 1,25 - 2,5

7 - 14°

12 - 25°

8,75 - 17,5°

3 - 7

hard

2,5 - 3,75

14 - 21°

25 - 37°

17,5 - 26,3°

7 - 15

very hard

above 3,75

above 21°

above 37°

above 26,3°

above 15

Tab.4.6.A.

Содержание MFS25

Страница 1: ...MFS 25 35 INSTALLATION AND MAINTENANCE MANUAL SOFT MOUNTED WASHER EXTRACTOR PUBLICATION DATE Sep 05 WITH ELECTRONIC PROGRAMMER 100646...

Страница 2: ...2 4 5 4 INSTALL SUPPLY CABLE TO THE MACHINE 13 4 5 5 CHECKING ROTATION DIRECTION 14 4 5 6 MULTIPLE MACHINES IN LINE SIMPLE PHASE 14 4 6 CONNECTION OF WATER SUPPLIES 14 4 7 CONNECTION OF LIQUID WASHING...

Страница 3: ...terminals and This voltage must be below 30 VDC before you can access the inverter for inspection The washer extractor is intended to be permanently connected to fixed wiring The washer must not be op...

Страница 4: ...552 lb 300 kg 662 lb 485 kg 1070 lb ELECTRICAL DATA 3x380 415V N 50Hz applicable for 16 kg 36 lb 3x380 415V 50Hz applicable for 16 kg 36 lb 3x380V 60Hz applicable for two motor drive 3x440 480V 60Hz...

Страница 5: ...nt with drain valve 3 5 l s 3 5 l s 3 5 l s 3 5 l s CONNECTION OF STEAM Steam connection G1 2 Steam pressure low 1 3 bar 14 5 44 PSI Steam pressure high 3 8 bar 44 116 PSI ELECTRICAL CONSUMPTION Light...

Страница 6: ...36lbmachine with frequency control drive Fig 3 1 1 Control panel 2 Connection liquid soap 3 Serial plate 4 Soap hopper venting 5 Water supply 6 Frequency inverter 7 Fuses 8 Main switch 9 Electrical su...

Страница 7: ...480 mm 18 90 430 mm 16 92 H 263 mm 10 35 263 mm 10 35 263 mm 10 35 300 mm 11 81 I 910 mm 35 83 910 mm 35 83 970 mm 38 19 1135 mm 44 68 J 103 mm 4 06 103 mm 4 06 103 mm 4 06 120 mm 4 72 K 980 mm 38 58...

Страница 8: ...t on the transporting wooden id until the time of final installation on the foundation according the chapter 4 3 of this manual 4 3 MACHINE POSITIONING WARNING IF THE MACHINE IS LOCATED ON AN ELEVATED...

Страница 9: ...MACHINES 16kg 36lb Place between the four corners of the frame and the floor a thin rubber sheet of 10x10cm 3 93 x3 93 with thickness between 1 2 0 04 0 08 maximum We advice to fasten this machines a...

Страница 10: ...that it can carry the static and dynamic forces The thickness of iron profiles is minimum 4 mm 0 158 For 6kg 13lb 7kg 16lb 10kg 22lb machines remove the four rubber feeds from the machine frame Do not...

Страница 11: ...to the bottom of the frame MACHINES 16kg 36lb The 16kg 36lb machines don t have rubber feet for adjustment to water level When it is necessary use thin hard plates of 10x10cm 3 93 x3 93 with thickness...

Страница 12: ...AND MAINTENANCE MANUAL 11 After removing the shipping bars put the service panel fig 4 4 pos 3 and the rear panel fig 4 4 pos 4 back on the machine Keep the shipping bars pos 1 2 for possible future...

Страница 13: ...e is not equipped with a supply disconnecting device like a main switch then a supply disconnecting device need to be provided in the installation for all electrical supplies connected to the machine...

Страница 14: ...CONNECTED AS THE LAST ONE Push the cable through the turnbuckle and connect the wires with the main switch The diameter of the supply cable must between 11 17mm 0 43 0 67 for M25 turnbuckle and betwee...

Страница 15: ...phase L2 The fourth machine must again be connected to the first phase L1 This assures a better load of the electrical network Fig 4 5 D Multiple machines in line 4 6 CONNECTION OF WATER SUPPLIES WAT...

Страница 16: ...ulate the total water consumption in one washing program by counting up the amount of water by each washing step An example is shown for a system with cold and warm water supply for a machine with cap...

Страница 17: ...also be a hole every twenty meter in the drainpipe fig 4 6 B pos 1 to assure the good working of the drain This allows air in the main drain and facilitates drainage of the water flow Every time a mac...

Страница 18: ...e machine For 16kg 36lb machine it is sufficient to open the top panel by means of the two key switches at the front At the right side panel there is a support for the top panel The hoses of external...

Страница 19: ...ck protective connection earthing and electrical supply connection 6 Open water valves to machine and check hose and connections for leaks 7 Read carefully the User s manual and Programming manual whi...

Страница 20: ...inlets CHECKING AND MAINTENANCE EVERY THREE MONTHS WARNING HOT MACHINE PARTS SHOULD BE ALLOWED TO COOL FIRST 1 Check if the drain valve is not leaking during the wash process It is also important tha...

Страница 21: ...must still touch the tub rubber at the hinge side when the door opens at 5 3 Adjust the position of the door by loosening the screws pos 4 on the door frame The door hook must be right in the center...

Страница 22: ...the first installation and then once in a year a qualified worker verifies the vibration switch fig 5 2 C 5 Dismantle 6kg 13lb 7kg 16lb 10kg 22lb the top cover by two bolts on machine rear for machin...

Страница 23: ...are worn out or damaged TO CHANGE THE BELTS NEVER USE A CROWBAR TO TAKE OFF THE BELTS OVER THE PULLEY GROOVES 1 Dismantle the rear panel fig 5 2 D pos 1 2 Take off the belts pos 2 by pulling the belt...

Страница 24: ...E BOLTS REPLACE A DAMAGED BOLT WITH A BOLT OF THE SAME STRENGTH VALUE MARKED ON HIS HEAD IGNORING OF THE BOLT QUALITY AND MECHANICAL STRENGTH CAN CAUSE SERIOUS BODILY INJURIES The recommended torque v...

Страница 25: ...orrect amount of coins is not inserted the door is not closed properly set the Key switch to Run mode the start button must be pressed when 00 is flashing on the lower display close the door Coins are...

Страница 26: ...ncing a program turn the key switch in program mode and press the start button When the water is drained you can open the door clean the drain clean the drain valve The water does not stay in the mach...

Страница 27: ...ram check and replace wiring replace the V belts repair or change motor repair or replace the frequency converter There is a lack of steam leak in steam system too many condense in the steam system to...

Страница 28: ...551 002 217 Heating element 2x2000W 230V electrical heating 12kW applicable for 16kg 36lb PRI 342 000 032 Heating element 2x3000W 230V electrical heating 9kW 18kW applicable for 16kg 36lb PRI 342 000...

Страница 29: ...its usage period respect the following instructions 8 2 1 POSSIBILITY OF THE MACHINE LIQUIDATION BY THE SPECIALIZED COMPANY Machine liquidation is executed by the competent company which respects mate...

Страница 30: ...NSTALLATION DATE INSTALLATION CARRIED OUT BY SERIAL NUMBER ELECTRICAL DETAILS VOLT PHASE HZ NOTE ANY CONTACTS WITH YOUR DEALER REGARDING MACHINE SAFETY OR SPARE PARTS MUST INCLUDE THE ABOVE IDENTIFICA...

Отзывы: