![Mayer TM 2400DR Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/mayer/tm-2400dr/tm-2400dr_operating-instructions-manual_1747155023.webp)
23
6 Operation
1. Normal operation
a) Before starting operation the following shall be checked:
•
Are pots, plants and soil mixture available in sufficient
quantity?
Care about the following
•
Soil transport
•
Plant feeding and unloading
•
Pot preparation
•
Use the shortest transport routes
b) Adjusting or shifting the pot turntable
•
Attach reversible ratchet to shifting spindle and open
adjustable pot holder by turning it anti-clockwise.
•
Pot supports always remain at the same height
•
Reversible ratchet at the shifting spindle
- Turn to the left
> pot holder goes down
- Turn to the right
> pot holder goes up
Содержание TM 2400DR
Страница 4: ...4 2 Structure Plan view of potting machine 2400DR back right left front ...
Страница 39: ...39 9 Part list ...
Страница 45: ...4 2 Functional description ...
Страница 58: ...17 6 Part list ...
Страница 60: ...19 ...