28
II.
Speed of the belt may be increased or decreased by rotating
the star wheel as it is marked.
Before setting is started, clamping lever of spindle of the star
wheel shall be loosened and when the required speed is set it
shall be tightened. Thus the continuously moved elevator plates
carry larger or smaller quantity of soil.
When quantity of soil is set, always make setting by only one or
two rotations and then wait until 40-50 pots are filled. Then
correction may be made if it is necessary.
III.
Number of elevator plates may be doubled on charge of extra
costs.
Note:
Care shall be taken to set right the required soil quantity.
Thus you save the elevator and it results in longer lifetime.