This page intentionally left blank
Страница 1: ...Volt DC 2 amp service Confirm that the circuit you intend to use will accommodate the additional load Circuit must be fused and use appropriate gauge stranded wire for electrical connections NOTE Wall...
Страница 2: ...This page intentionally left blank...
Страница 3: ...a caulking sealant compatible with the flange plastic product and the roof surface DO NOT use materials containing solvents such as or similar to Xylene Toluene Methyl Ethyl Ketone MEK Acetate or Acet...
Страница 4: ...t for ventilation separate the screen and shade by moving the pull bars in opposite directions Note The screen shade opening and closing action is manual Depress the button on the Rooflight frame to r...
Страница 5: ...g flange to the rooftop flange taking care not to overtighten the screws to avoid cracking or deforming the ceiling flange and rooftop flange STEP 9 Optional Install the screws to secure the ceiling f...
Страница 6: ...NSTRUCTIONS Cleaning of your MAXXAIR SKYMAXX ROOFLIGHT may be achieved with mild soap and water only DO NOT USE ABRASIVE CLOTH ON ROOFLIGHT COVER It is advisable when the Rooflight is open to keep the...
Страница 7: ...This page intentionally left blank...
Страница 8: ...For additional product information please visit www AIRXCEL com AIRXCEL INC RV Products Division MAXXAIR 3050 N St Francis St Wichita KS 67219 316 832 3400 PLACE CONSUMER LABEL HERE...