
Water element: Close the shut-off water valves of the building water circuit to the air curtain (supply and
return). Open the service panel and empty the water.
Remove the screws that fix the water coil to the air
curtain.
Tilt the water coil as shown in the
picture,
in
order
to
extract
the
connection pipes of its holes and pull
out the water coil for the front part of the
air curtain.
We do the same process in reverse
order to fix the new water coil.
.
Содержание MXW 1500 A
Страница 2: ...INSTALLATION DIAGRAM WITHOUT REGULATION...
Страница 3: ...INSTALLATION DIAGRAM WITH REGULATION...
Страница 10: ......
Страница 11: ......
Страница 19: ......