3.3 Don’t install the unit too low, no less than 2.3
meter from the ground.
2
.
3
m
3.4 When the entrance is wider than the unit, it is
recommended to install two or more units in
parallel. In this case, provide 20-40mm gaps
between the units.
3.5 Don’t allow gaps between the unit and the
wall. When hanging it from the ceiling, using the
enclosed ceiling braskets.
3.6 Don’t install the unit in a place where it is
splashed by water, exposed to excessive steam,
explosive gas or corrosive gas.
4
、
INSTALLATION
A
、
Installing on the concrete wall:
4.1.1 Removed the mounting plate
Unclamping the fixed screws on the back of
main body to removed the mounting plate.
MO UNTIN G PIATE
FIXI NG SC RE W
4.1.2 Fix the bolts in the proper position (Decide
the position with the mounting plate and pour
cement into the bolt holes.)
CONC RETE
13-15mm
70mm
φ
4
0
-
5
0
m
m
3