Test Switch Wiring Diagram
General Wiring Diagram
CAUTION:
Turn off electrical power at fuse
or circuit breaker box before wiring fixture to
the power supply.
Connecting panels to AC source supply:
All units must be individually connected to
the AC supply.
Brown = Line (Wall Switch)
White = Neutral
Green = Ground
Black = Line
PE
N
L(in)
L
L(in)
Wall Switch
PE
(i
n)
N
(in
)
L
(in
)
Green/Yellow
White
Black
Black
White
White/Black
Surge
Protector
Emergency
Controller
LED
Output
Test
Switch
Battery
ACL
ACN
Brown
Blue
PE Green/Yellow
Driver
Brown V+
Blue V-
Yellow
Black
Red
Red
Black
Violet
Brown
Junction
Box
Test Button
Battery Module
Converter
Connector
Operating Instructions MaxLite Hazardous Location Linear Light
MaxLite Hazardous Location Linear Light
®
© Copyright 2021. MaxLite, Inc. All Rights Reserved.
12 York Ave, West Caldwell, NJ 07006 Tel: 800-555-5629 Fax: 973-244-7333 Email: [email protected]
Page: 2
REV: 9/30/21
Emergency Controller
Test Switch Port
Brown
Violet
LED PCB
WAGO 221-413
Status Indica on
(Red LED)
Remote Cable (Needs to be provided by the customer.)
18AWG*2
Max Length: 35m
Connector (Needs to be provided
by the customer)
White
Black
Brown
Violet
Test Switch
Luminaire Housing
The test switch needs to be installed in a non-hazardous area, connected to the inside of the luminaire through a remote cable,
and connected to the test button port of the emergency controller. The cable of the test switch port has been pre-installed with
WAGO's 221 connector for easy connection.
The recommended specification for the test switch and remote cable is 2*18AWG cable, and the tested maximum allowable
wire length is 35M.
The test switch port is also connected in parallel with a red status indicator (located on the light source board). If the indicator is
disconnected, a longer length of the remote cable can be allowed.