MAXA-MISER VR028A15M/H Скачать руководство пользователя страница 2

4.

Remove 9 screws holding painted outside center post
between horizontal return air openings.

5.

Remove clip, two screws on the top and two 

3

8

" head

screws on the bottom to remove inside galvanized
center post. 

See Figure 2 and 3.

6.

Install balancing damper assembly. Reinstall painted
outside center post. 

See Figure 4 and 5.

7.

Adjust balancing damper to minimum air flow

requirements by loosening the set screw and moving
adjustable rod to desired setting. 

See Figure 6.

8.

Locate the provided field wiring harness and plug into
the economizer plug of the rooftop unit. If rooftop unit
has 12 pin plug, the provided adapter will be needed.
Route field harness through balancing damper so
connection can be made to UERV after installation.

See Figure 7.

9.

Locate the two provided door panels. Secure the door
panels to the horizontal return openings using the
provide #10 x ½" screws. 

See Figure 8.

10. Locate the provided platform support rail. Align the

platform support rail with the center post of the rooftop
units return opening. Attach the platform support rail  to 
the upper set of holes in the door panel using the
provided #14 screws. 

See Figure 9.

11. Using lifting lugs, raise UERV unit approximately three

(3) feet.  Remove nut and bolt assembly to slide
telescoping part of leg out of guide. Position standoff
legs so that flat foot is on bottom of stand and reinstall
nut and bolt assembly. Do not fasten tightly,
adjustment will need to be made when unit is put into
position.  

12. Apply the provide ¾" x 1 ¼" gasket down the center of

the UERV back panel and between platform support
rail and door panels.

13. Lift and move UERV unit into position in front of

horizontal exhaust air opening.

Note: A treated 2" x 6" x 60" piece of wood or

equivalent should be used under feet of standoff
legs to prevent roof penetration.  

14. Remove screws from top panel of rooftop unit. Ensure

top will move up at least 2".

15. Lower UERV into bottom support plate catching the

front edge of the UERV bottom into the ½" flange. With
the UERV in place, adjust the standoff legs to level and 
support UERV against rooftop unit. Tighten securely.
Rotate lifting lug to original position and tighten
machine bolts

16. Place UERV top flange under the rooftop unit top panel 

secure the rooftop unit top panel with existing screws.

See Figure 10.

17. Secure the side flanges of  the UERV to the holes in the 

door panels installed earlier with the provide #10 x ½"
screws.

18. Locate the plug extended from back of UERV through

opening in door panel. Connect this plug to the field
wiring harness installed earlier.

PAGE 2

Figure  1

Figure  2

Figure  3

REMOVE

REMOVE

FILTER ACCESS

REMOVE

MAXA-MI$ER

Ô

UNITARY ENERGY RECOVERY VENTILATOR

MODEL VR028A15M/H & VR028A25H  (STATIONARY) 

 INSTALLATION

INSTRUCTIONS

035-19268-002-A-0709 / R28A-18YDW

Содержание VR028A15M/H

Страница 1: ...m back to the cold drier intake air supply during the other half rotation In summer the process is automatically reversed Heat and moisture are absorbed from incoming fresh air supply and transferred...

Страница 2: ...Position standoff legs so that flat foot is on bottom of stand and reinstall nut and bolt assembly Do not fasten tightly adjustment will need to be made when unit is put into position 12 Apply the pro...

Страница 3: ...oftop unit This is accomplished by removing door panel at the return air opening loosing screw in center of damper then slide damper rod up or down in the return airstream and re tighten screw Replace...

Страница 4: ...otating when in the air stream the UERV is always being cleared by air first in one direction then the other Because it is always dry dust or other particles impinging on the surface during one half c...

Страница 5: ...icated sealed bearings no further lubrication is necessary Mechanical Inspection Make visual inspection of dampers linkage assemblies and UERV rotating bearings during routine maintenance Filters shou...

Страница 6: ...two outer corners press the segment towards the center of the wheel and inwards against the spoke flanges If hand pressure does not fully seat the segment insert the flat tip of a screw driver betwee...

Страница 7: ...04 1 09 1 09 1 09 1 08 1 05 0 99 0 90 0 82 0 75 0 89 0 88 0 87 0 85 0 81 0 75 0 66 0 59 0 5 0 69 0 68 0 65 0 62 0 57 0 5 0 42 0 35 0 25 0 00 0 20 0 40 0 60 0 80 1 00 1 20 1 40 1500 1600 1700 1800 200...

Страница 8: ...PAGE 8...

Страница 9: ...x Wheel J51 Jack Control Box Exhaust Air J56 Jack Control Box Damper J148 Jack Fresh Air Motor Harness J150 Jack Wheel Motor Harness J151 Jack Exhaust Air Motor Harness J152 Jack Transformer High Volt...

Страница 10: ...w ambient switch 2 Step down transformer assembly for 460 volt units 3 Selective voltage terminal for proper unit voltage 4 Optional low ambient switch 5 Optional motorized intake damper 6 Optional st...

Страница 11: ...PAGE 11 EQUIPMENT LAYOUT...

Страница 12: ...g Contractor Start Up Mechanic q Inspect the unit for transit damage and report any damage on the carrier s freight bill q Check model number to insure it matches the job requirements q Install field...

Отзывы: