![Matthews Fan Company Brisa 2000 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/matthews-fan-company/brisa-2000/brisa-2000_installation-instructions-manual_1742214006.webp)
Matthews Fan Company
Brisa 2000
&
DLC Installation Instructions
Page 6
ALTERNATE SLANT CEILING HANGING MECHANISM INSTAllATION
INSTRUCTIONS
NOTE: MAIN FAN INSTAllATION
INSTRUCTIONS ARE WRITTEN TO
ACCOMMODATE A FLAT CEILING HANGER.
IF A SLANT CEILING HANGER HAS
BEEN SPECIFIED, PLEASE USE THESE INSTRUCTIONS
FOR HANGING YOUR
FAN.
1.
Secure the hanger bracket securely to the ceiling junction/outlet
box using the hardware provided.
2.
Attach the down rod end with 3 holes to the fan body according to the main installation
instructions
(down
rod end with 4 holes should be oriented to top/ceiling
and end with 3 holes to bottom/fan).
Attach lower
canopy to down rod with 1/4-1/8" clearance
between fan body and canopy.
Slip ceiling canopy down the
down rod and rest it on the lower canopy with open/wide end upwards.
3.
Carefully slide ball hanger down the down rod with flattened side upward and curved side downward.
Push
cross pin through 2 of the 4 upper down rod holes and then raise ball hanger until the cross pin is correctly
positioned
and tight in the ball hanger.
Secure ball hanger onto down rod with set screw located in ball.
Tighten setscrew well.
Ball hanger should now be securely fastened to down rod.
4.
Lift entire fan body by down rod and place ball into the socket of the hanger
bracket
already
securely
attached to junction/outlet
box.
Rotate the down rod until the check groove in ball meets the notch in the
bracket and the ball/down
rod/fan assembly are firmly positioned.
The ball/down
rod assembly
should not
rotate any longer in the bracket if this is done properly.
The fan body itself should be free to rotate.
The
ball/down
rod assembly
should slide in the check groove of the bracket up and down, but it should not
rotate from side to side.
5.
Make all electrical connections
and then tuck the wires neatly into the ceiling junction/outlet
box.
6.
Attach the ceiling canopy by sliding the canopy up the down rod until it meets the hanger bracket.
Rotate
the canopy so that the screw holes are aligned and secure with the two screws positioned
on bracket.
7.
Make sure that down rod is hanging perpendicular
to floor.
BRISA 2000 CULlCSA SAFETY CABLE INSTAllATION
INSTRUCTIONS
See Diagram I
Note: These instructions are for residents of Canada only.
1.
Thread
one looped
end of cable directly through
both horizontal
wire ports on sides of Top Shaft (A),
stopping short of pulling other looped end through Top Shaft (A). You may need to flatten loop slightly to
make it to pass through the shaft easily.
2.
Thread other looped end of cable through the eye of first looped end and pull cable taut so that the cable is
secured to the side of Top Shaft (A). Cable should be tight in an arc against one side of Top Shaft (A).
3.
Down Rod (D) should now be attached to Top Shaft (A), oriented with three-holed
end to bottom, closest to
top Shaft (A).
4.
Thread cable through Down Rod (D) by entering 3
rd,
upper hole in the down rod.
5.
Attach
end of cable protruding
from Down Rod (D) to building
structure.
Hardware
to attach cable to
building structure not provided.