background image

 

      

              

ARD-1-100TP  EV Charger Connection Unit 

 

V1.10 

                                                          

10 | 

P a g e

 

Specifications 

Description 

Electric Vehicle Charger Connection Unit 

Input (Volts) 

Nominal input voltage 400v, 50Hz, 3 Phase AC 

Max Load 

100A 

Dimensions (HxWxD) 

550mm x 360mm x 140mm 

Weight 

Approximately 7 kg 

Operating Temp 

-5°C to +40°C 

Enclosure 

Mild Steel Powder Coated 

Power Consumption 

12VA 

Ingress Protection 

IP4X 

Document Revision        

V1.10 Oct 2021 

 

Terminal Capacities

 

Min 

Max 

Incoming Isolator cable size &  
tightening torque 

2.5 mm

    

1.5Nm 

25.0mm

2Nm 

Outgoing Terminals cable size &  
tightening torque 

16 mm

    

5.6Nm 

50mm

5.6Nm 

 

 

Warranty  

The ARD-1-100TP unit is guaranteed for a period of 1 year from the date of 

manufacture.  

This warranty is limited to the replacement of faulty components only. 

 

 

 

t: 01543 227290       e: [email protected]       w: 

www.matt-e.co.uk

 

matt:e Ltd, Unit 5, Common Barn Farm, Tamworth Road, Lichfield WS14 9PX 

Содержание ARD-1-100TP

Страница 1: ...Electric Vehicle Charger Connection Unit ARD 1 100TP Installation Manual V1 0 Oct 2021...

Страница 2: ...7 Operating Instructions 9 Test Function 9 Specifications 10 Warranty 10 Declaration of Conformity 11 PRODUCT ADVISORY NOTICE This product must be installed by a competent person in accordance with t...

Страница 3: ...Please read and observe the following notices carefully These warnings must be observed when installing and operating the Electric Vehicle Charger Connection Units All relevant supplies must be isolat...

Страница 4: ...s all poles of the supply including CPC The 5 pole isolator will automatically reset after a PEN fault but must be manually reset after an overcurrent fault in line with IET Wiring Regulations and cod...

Страница 5: ...ARD 1 100TP EV Charger Connection Unit V1 10 5 P a g e...

Страница 6: ...ARD 1 100TP EV Charger Connection Unit V1 10 6 P a g e...

Страница 7: ...ARD 1 100TP EV Charger Connection Unit V1 10 7 P a g e Electrical Connections The user wiring connections are indicated in the diagrams below...

Страница 8: ...hould be connected to the terminal block Connect the outgoing cable and CPC to the terminal blocks THIS PRODUCT IS DESIGNED FOR AN ISOLATED EARTHING ARRANGEMENT CHECK BEFORE USING SWA CABLE On complet...

Страница 9: ...supply to the under voltage release mechanism of the 5 pole isolator This will cause the 5 pole isolator to open disconnecting all phases neutral and CPC from the load Once the fault condition has cle...

Страница 10: ...tion 12VA Ingress Protection IP4X Document Revision V1 10 Oct 2021 Terminal Capacities Min Max Incoming Isolator cable size tightening torque 2 5 mm 2 1 5Nm 25 0mm 2 2Nm Outgoing Terminals cable size...

Страница 11: ...ications have been applied EN60255 1 2010 Emissions standard for Measuring Relays and Protection Equipment EN55011 Class A 2011 A1 2017 Emissions Standard for ISM Equipment EN60255 26 2013 Immunity st...

Отзывы: