INSTALLATION GUIDE
L2R with Heating Pad
Страница 1: ...INSTALLATION GUIDE L2R with Heating Pad...
Страница 2: ...ing the chassis 3 Do not place the glass down on any hard surfaces such as hardwood tile granite concrete vinyl or linoleum 4 When storing the glass either during installation or re moval always place...
Страница 3: ...e for desired wall bracket placement Ensure the bracket is level and ready to be securely fastened to the wall 3 ATTACH BRACKET Secure brackets to the wall using screws designed for the mounting subst...
Страница 4: ...ltage Connect the power cable from the mirror to the wiring in the junction box using UL approved wire connectors Make sure the power cable passes through a junction box cover before making power conn...
Страница 5: ...ating Pad Installation Manual 7 HANG MIRROR Connect low voltage wires from the frame to the corresponding lead coming from the glass Then attach glass by holding the glass slightly above the mounting...
Страница 6: ...RNING PLEASE REFER TO THE ELECTRICAL SPECIFICATIONS LISTED ON THE MIRROR FRAME TO VERIFY THE CORRECT WIRING CONFGURATION AND INPUT VOLTAGE DIRECT INDIRECT MIRRORS MAY HAVE TWO SETS OF WIRING WIRE TOGE...
Страница 7: ...L2R Mirror with Heating Pad Installation Manual www matrixmirrors com led mirrors 07...
Страница 8: ...5965 Peachtree Corners East Suite A 1 Norcross GA 30071 www matrixmirrors com led mirrors 678 580 5717...