![Matchmaster DigiMatch 02MM-DG91 Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/matchmaster/digimatch-02mm-dg91/digimatch-02mm-dg91_installation-instructions_1739437001.webp)
Step 1
Assemble 2 halves of boom
together. See diagram.
Step
3
Strip coax cable as shown in diagram.
Fold shielding braid back over cable jacket.
Step 4
Select connector provided.
(Suitable for RG6 or semi airspaced cable)
Place “F” connector on back to front
and twist to ensure that all braid is flat.
See diagram.
(For other cable types you
will need to purchase
the corresponding connector)
Step 6
Select the UHF balun, then connect the cable
you have just prepared to the
connector on the balun marked
"OUTPUT".
02MM-DG91
91 Element UHF Antenna Installation Instructions
Step 2
Cut rubber boot seal as
in diagram.
Feed cable through
boot seal.
Step 5
Then insert cable into rear of connector and twist
connector clockwise until dielectric is flush with the
bottom nut as in diagram.
Ensure that
2-3mm of centre
core conductor
protrudes
past the nut.
Step 7
Then slide rubber boot seals into
position as per diagram.
by
DG91 7-13
Centre Conductor
Centre Insulation
Outside Cover
Shielding Braid
6mm
6mm