![Matan Digital Printing Barak 5 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/matan-digital-printing/barak-5/barak-5_technical-notes_1739351008.webp)
10100125 - A
© Matan Digital Printers Ltd
Page 8 of 19
3. Turn on the Barak FE in E
NGINEER
M
ODE
, and open the I/O
U
TILITY
dialog box, as shown below.
4. Make sure all the 8 A
IR
V
ALVES
check boxes are checked.
5. In the SIT group box, click the P
RESSURE
option.
All the SITs will empty.
6. When air starts coming out from the nozzles, click the
V
ACUUM
option.
The SITs are now completely empty.
7. Prepare an external pump as shown below, (you can use
two simultaneously).
The figure below, shows an AC pump, but, if your system is
configured for a DC pump, you should use a DC pump.