INSTALLATION OF PUMP OPERATED AQUA2USE GWDD 

The Matala Aqua2use GWDD is specifically designed for Grey Water (Gray Water) reuse from the 
laundry, shower and bath waste water. 

We recommend that you also check with your local Water Authority if an approval must be applied for 
to install this type of Seasonal Use Grey Water Diversion Device and if there is any restriction as to who 
is allowed to install this unit. 

It is mandatory that the power circuit to the Aqua2use GWDD is protected by a residual current circuit 
breaker and 

we highly recommend a surge protection device be fitted as well.

CONNECTING YOUR UNIT

1.

Position the unit near your 50mm (2”) DWV greywater waste pipe, allowing approx 360 mm 
(14.2”) from ground level to cut in point Inlet 

and 214mm (8.4”) from overflow point 

If the unit is not preassembled remove the filters and all of the fittings from the unit, 

taking 

note of the order of the filters. 

  Water should flow from inlet to outlet through the Black 

Green

 

Blue

 

Grey

 

filters.

2.

Sit the unit on a suitable concrete slab as a stable base making sure that the unit is level and 
the drain point 

M

 is accessible. Assemble and fit the drain assembly 

M

. Ensure the backing 

nut is tight. The fitting on the drain has a 25mm (1”) thread and plug provided and the 
outside diameter is suitable for 40mm (1.5”) DWV pipe. This should be plumbed back to your 
waste pipe for ease of cleaning. The plumber can fit an inline valve here for easy flushing.

3.

Now assemble the inlet basket 

D

. Position the threaded elbow inside the basket to the 

lowest point with the female thread pointing outward. Fit the bulkhead adaptor 

C

 through 

the corresponding hole in the tank 

into the inlet basket. Make sure it is tight and the 

gaskets are in place. The elbow should be facing down. Now thread the upper bulkhead 
adaptor 

C

 into the female thread diverter valve. Again make sure it is tight and the gaskets 

are in place.

4.

Fit the overflow stand pipe 

to corresponding hole in the bottom of inlet basket. Make sure 

the pipe fits through the basket. It is possible to adjust the overflow level by moving this 
pipe up or down, but we advise that, the bottom end of the pipe reaches the lowest point of 
the basket. The inlet and overflow assembly should now be completed.

Содержание Aqua2use GWDD

Страница 1: ...Installation and Operating Instructions Congratulations you are now the proud owner of an Aqua2use GWDD CLICK ANYWHERE on THIS PAGE to RETURN to GREYWATER FLUSH TOILETS at InspectApedia com ...

Страница 2: ...e concrete slab as a stable base making sure that the unit is level and the drain point M is accessible Assemble and fit the drain assembly M Ensure the backing nut is tight The fitting on the drain has a 25mm 1 thread and plug provided and the outside diameter is suitable for 40mm 1 5 DWV pipe This should be plumbed back to your waste pipe for ease of cleaning The plumber can fit an inline valve ...

Страница 3: ...rred in transit 7 Starting at the inlet basket end install the MATALA filter media in the tank Starting with BLACK then GREEN Make sure the filters slide all the way home to fit snug to the bottom of the unit 8 Now install GREEN and BLUE filters Again Make sure the filters slide all the way home to fit snug to the bottom of the unit 9 Now you are ready to install the last two MATALA filters in ord...

Страница 4: ... using a pump to produce the head pressure to move the water out of the Aqua2use GWDD it is critical that the location of the Gravity unit is of sufficient height to operate the drip system Generally 1 metre 40 inch is the absolute minimum head required Please refer to manufactures recommendations as this will differ between products 3 Connect a length of 25mm 1 lilac pipe from the point M to your...

Страница 5: ...el is high on inlet side Service and clean the filter media to maintain Flow Grey Residual is building up around the Pump Check the filter media make sure it is seated correctly and that there are no voids under the filter mats which will cause bypass around the filters Your unit could need servicing Offensive odours are released from your unit Thoroughly clean the unit and the filter media Make s...

Страница 6: ...eywater entering the unit 2 Remove the Stainless Steel clips from the unit Then remove the lid 3 You can now access the MATALA filter media 4 For PUMP OPERATED UNITS it is advised to drain the unit via the drain fitting M 5 For GRAVITY OPERATED UNITS you need to open your drain valve on the bypass tee 6 If you don t have this installed remove the pipe from the bottom fitting M and fit a temporary ...

Страница 7: ... no residual remaining in the unit The EPC also avoids the use of an external clock which will easily be disrupted by temporary shutdown of electrical supply No electrician is required and only one standard 10amp outlet is needed to be connected to operate the unit All government departments are pushing for low or no residual water in Grey Water Gray Water Diverters Your Aqua2use GWDD meets or exc...

Страница 8: ...g along with the Matala filter mats GRAVITY OPERATION OF THE AQUA2USE GWDD To start up the unit Direct the diverting valve B to allow grey water gray water to divert into the unit Ensure you have positioned the unit with enough height head to operate the irrigation system Minimum requirements will have to be calculated out on site Grey water Gray water will flow through the filters and out to your...

Страница 9: ...faulty if inside the warranty period and the fault was no caused by misuse Incorrect installation or operation of your unit is not covered by warranty Damages incurred to persons or property by incorrect operation or installation of your unit are not covered by this warranty Warranty commences from date of purchase please provide proof of purchase with all warranty claims ...

Отзывы: