INSTALLATION  

 

 

14

 

October 2011 / Sunmaster XS4300-3200-2000 / EN 

4.3.2 

Country code selection 

Follow the steps below to configure the Sunmaster in 
accordance with the local regulations for grid connection 
(example: Italy). 
 

CAUTION! 

NEVER connect the Sunmaster to a utility grid 
other than selected. 

 
1  After commissioning the following message is 

displayed.  

 

2  Select the applicable country code from the table.  

Country code 

Norm  Use Allowed in 

GERMANY 1P, 
limited to 4.600 W 

ENS 

Germany, Austria, Belgium 

GERMANY 3P 

ENS 

Germany, Austria, Belgium 

SPAIN 

QNS Spain 

ITALY 

ENS Italy 

UK 

QNS 

United Kingdom 

FRANCE 

ENS France 

AUSTRALIA 

QNS Australia 

GREECE 

QNS Greece 

HOLLAND 

QNS 

Netherlands, rest of 
Europe 

USA 240V 

QNS 

USA (Split Phase 240V) 

USA 208V 

QNS 

USA (ThreePhase 208V) 

KOREA 

QNS 

South Korea 

TAIWAN 

QNS Taiwan 

 
3  Press S4 to scroll through the country codes.  
 
4  If the correct country code is shown, press S2 to 

select  

 

 

5  Confirm your selection by pressing S3 (or cancel by 

pressing S4).  

 

 

If a wrong country code was entered, you can 
start the procedure over again by pressing S2 
and S4 simultaneously during 3 seconds. 

 
6  Now the Sunmaster switches on. See chapter 0 for 

operation instructions.  

 

If you selected GERMANY 3P, the three 
inverters switch on/ off together and only 
when the three are MasterBus connected. 
See section 4.1, reference (7) for MasterBus 
connection of three inverters. In 3 phase 
configuration, the 3-PH block function is 
important, see section 5.3.5 and 5.3.8. 

 
 

4.4 DE-COMMISSIONING 

If it is necessary to de-commission the Sunmaster, follow 
the instructions in order of succession as described below: 
 

CAUTION! 

Follow below mentioned instructions in order 
of succession as described. 

 
1  Cut off the grid voltage by switching off AC distribution 

switch in the meter cupboard.  

2  If such is applied, move the DC switch to the OFF-

position. 

3  Disconnect the MultiContact connectors from the 

Sunmaster. 

4  Remove the bottom plate of the Sunmaster and 

disconnect the AC wiring. 

Now the Sunmaster can be demounted in a safe way.  
 

 

Press S4 to cancel 

the selection 

S1 S2 

S3 

S4 

Press S3 to confirm 

the selection 

Press S2 to select the 

displayed country code 

Press S4 to scroll through 

the country codes 

S1 S2 

S3 

S4 

Press S4 to scroll through 

the country codes 

S1 S2 

S3 

S4 

energybulbs

.co.uk

energybulbs

.co.uk

Содержание Sunmaster XS2000

Страница 1: ...UNG MANUEL UTILISATEURS ET D INSTALLATION MANUAL DEL USUARIO Y DE INSTALACI N MANUALE DI USO E MANUTENZIONE Sunmaster XS4300 XS3200 XS2000 Grid connected solar inverter MASTERVOLT Snijdersbergweg 93 1...

Страница 2: ...ion 4 1 2 Use of this manual 4 1 3 Validity of this manual 4 1 4 Guarantee specifications 4 1 5 Liability 4 1 6 Changes to the Sunmaster 4 1 7 Identification label 4 2 SAFETY GUIDELINES AND WARNINGS 5...

Страница 3: ...tandard 10 3 8 2 Connection of more than two strings option 10 3 9 General safety and installation precautions 11 3 10 Things you need for installation 11 4 INSTALLATION 12 4 1 Installation step by st...

Страница 4: ...the manual in a user accessible place This English manual has 32 pages 1 3 VALIDITY OF THIS MANUAL All the specifications provisions and instructions contained in this manual apply solely to the Maste...

Страница 5: ...is danger of gas or dust explosion or potentially flammable products Use of the Sunmaster other than as mentioned under 2 2 is not considered to be consistent with the intended purpose Mastervolt is n...

Страница 6: ...4 7 712 Check from the part number on the type number plate whether the Sunmaster is appropriate to be used for the intended application refer to table 1 Part number Description DC switch 131004300 XS...

Страница 7: ...stervolt Stockist BEFORE YOU START EN Sunmaster XS4300 3200 2000 October 2011 7 Never expose the Sunmaster to direct weather conditions such as rain snow or wind Install the Sunmaster in a sheltered e...

Страница 8: ...ORE YOU START 8 October 2011 Sunmaster XS4300 3200 2000 EN Do not expose the Sunmaster to humid or dusty environments Keep 10 cm clearance around the Sunmaster When installed next to each other keep a...

Страница 9: ...ng should have double insulation and must be fitted with pre assembled MultiContact connectors 4mm If two or more strings are connected to the same Sunmaster both string lengths must be equal CAUTION...

Страница 10: ...total input power must be distributed equally over both Solar inputs as much as possible See figure 3 2 3 8 2 Connection of more than two strings option In case more than two strings should be connect...

Страница 11: ...or the terminal connections Follow all steps of the installation instructions in order of succession as described The DC switch if installed must stay in the OFF position during the entire installati...

Страница 12: ...gure 4 5 Figure 4 6 5 Insert a flat blade screw driver in the indicated slots b Then remove the bottom plate of the Sunmaster 6 Feed the AC wiring through the left hand cable glad of the bottom plate...

Страница 13: ...ps described below to switch on the Sunmaster 1 Check whether the DC switch of the solar array is still in the OFF position or O position 2 Switch on the AC grid 3 Move the DC switch of the solar arra...

Страница 14: ...by pressing S4 If a wrong country code was entered you can start the procedure over again by pressing S2 and S4 simultaneously during 3 seconds 6 Now the Sunmaster switches on See chapter 0 for opera...

Страница 15: ...lop both plug and socket of the Sunmaster must be replaced 5 2 FORCED COOLING For an optimum internal temperature control the Sunmaster is provided with a cooling fan The cooling fan starts running sl...

Страница 16: ...ay actual readings of the Sunmaster are shown figure 5 3 By pressing S2 Source you can toggle between SOLAR 1 Data measured at DC input SOLAR1 AC GRID Data measured at the AC output of the Sunmaster F...

Страница 17: ...energy revenues When TOTAL is highlighted at the upper side of the LCD display the total performance since commissioning of the Sunmaster is displayed See figure 5 5 By pressing S2 Source you can tog...

Страница 18: ...ERROR LED isn t illuminated no failure is detected the Sunmaster is operating normally If the irradiation of the PV modules is insufficient for instance at night the Sunmaster switches off automatical...

Страница 19: ...he grid or none If inverter 1 fails to provide energy to the grid inverters 2 and 3 halt as well Figure 5 8 shows the display sequence when the first phase fails and starts up again 5 4 MAINTENANCE No...

Страница 20: ...et Select the correct country code See section 4 3 2 On TEMP HI Internal temperature of the inverter is high Maybe the air flow of the Sunmaster is obstructed See chapter 3 3 for installation guidelin...

Страница 21: ...60V DC MPP efficiency 99 9 Fraunhofer algorithm 99 9 Fraunhofer algorithm 99 9 Fraunhofer algorithm Operating voltage range 100 550V DC 100 600V DC 100 450V DC Rated current 15A 15A 11A Start up power...

Страница 22: ...ansients surge varistors MONITORING Indicator Backlit display with indication of power and diagnostic messages External communication 2 galvanic isolated RS485 databus connections External communicati...

Страница 23: ...line Guaranteed Low Prices Huge Stock Available Mastervolt Stockist SPECIFICATIONS EN Sunmaster XS4300 3200 2000 October 2011 23 7 2 OUTLINE DRAWINGS Figure 7 1 Dimensions in mm inch of the Sunmaster...

Страница 24: ...0397100 Data Control Premium II remote Datalogger to monitor up to 6 Sunmaster inverters over the Internet 130397200 Data Control Pro Analogue Datalogger to monitor up to 20 Sunmaster inverters locall...

Страница 25: ...oltage FH high off limit AC frequency FL low off limit AC frequency After each test the user has to confirm the test result before the inverter starts the reclosure count down and reconnects to the gr...

Страница 26: ...TEM MASTERVOLT FH test Actual Red on ACTUAL DAY TOTAL SYSTEM MASTERVOLT ACTUAL DAY TOTAL SYSTEM MASTERVOLT 2 sec 2 sec 2 sec To time display Reclosure time UL test Test time indication Blinking Blinki...

Страница 27: ...Y TOTAL SYSTEM Actual Actual Red on ACTUAL DAY TOTAL SYSTEM ACTUAL DAY TOTAL SYSTEM 2 sec 2 sec 2 sec Reclosure time FL test Test time indication Blinking Blinking Blinking To Time Display Confirm FH...

Страница 28: ...0800 043 8978 or 0121 250 2180 Quick Order Hotline Guaranteed Low Prices Huge Stock Available Mastervolt Stockist CERTIFICATES 28 October 2011 Sunmaster XS4300 3200 2000 EN 10 CERTIFICATES 10 1 CERTI...

Страница 29: ...AN Amsterdam The Netherlands Herewith declares that Product Sunmaster XS4300 Sunmaster XS3200 Sunmaster XS2000 is CE marked and complies with the following standards EMC Directive EMC 89 336 EEG Emis...

Страница 30: ...11am 5pm 0800 043 8978 or 0121 250 2180 Quick Order Hotline Guaranteed Low Prices Huge Stock Available Mastervolt Stockist CERTIFICATES 30 October 2011 Sunmaster XS4300 3200 2000 EN 10 3 AS4777 CERTI...

Страница 31: ...0 Quick Order Hotline Guaranteed Low Prices Huge Stock Available Mastervolt Stockist CERTIFICATES EN Sunmaster XS4300 3200 2000 October 2011 31 n e r g y b u l b s c o u k Snijdersbergweg 93 1105 AN A...

Отзывы: