Mastervolt International Masterlink BTM-III Скачать руководство пользователя страница 1

Quick installation

 

Masterlink BTM-III

 

 

 

 

 

 

 

 

 

 

Mastervolt International B.V,

    P.O.Box 22947,   NL-1100 DK Amsterdam,   The Netherlands.    

Tel.:

 +31-20-3422100    

Email:

 [email protected]    

Web:

 www.mastervolt.com   v1.1 061113EN 

Next:  

  The desired language must be set 

  The Masterlink BTM-III must be synchronized in 

accordance with the electrical installation 

 
Follow all steps as described in chapter 5 “FIRST 
START-UP” of the User’s manual 

5

Notes: 

  Connection of batteries 2 and 3 is optional  

  Keep all wires as short as possible  

  Keep wiring away from other noise producing 

conductors 

  Take adequate measures to avoid corrosion of the wires 

and connections  

  Do not exchange the wiring of the load side with the 

battery side 

  Use twisted wires for current sensing wires 

  Make sure that all minus cables of the electrical 

installation are connected at the load side of the shunt 

Connect the Masterlink BTM III as indicated below, but do not place the 2A-T fuses of the 
voltage sense wires yet! 

Load side  

Battery side 

Battery bank 1 

(Service battery) 

Battery bank 2 

Battery bank 3 

Masterlink BTM III 

Rear view  

Fuse 2A-T  

Fuse 2A-T  

Fuse 2A-T  

Voltage sense 

wires 

Battery side 

+           – 

+           – 

+           – 

Twiste

wi

re

 

LOW BATT RLY 
+ BATTERY 3 
+ BATTERY 2 
+ SERVICE BATTERY 
SHUNT BATT SIDE 
SHUNT LOAD SIDE 
GROUND 
+ POWER SUPPLY 

DC power supply 

8  50VDC 

Power cables must be 
connected here  

Twisted wires must be connected here  

Load side  

Check all wiring. 
If the wiring is OK: 

  Install the 2 A-T fuses of 

the voltage sense wires 

  Place all battey fuses.  

After a few seconds the display of the 
Masterlink BTM-III will show data. If not, 
immediately switch off the DC power supply 
and remove the fuses. Investigate the cause of 
the malfunctioning  

2

The electrical system must be 
disconnected from any power 
source during the entire installation!  
Use isolated tools! 
 
Read safety instructions (chapter 2 
of the user’s manual) 

This section provides a brief 
overview of a basic installation of the 
Masterlink BTM-III. 
 

However; please review the entire manual for 
connection of additional features and to ensure best 
performance and years of trouble-free service. 

Отзывы: