background image

Professional

 

Compaction

OPERATION 

MANUAL

TAMPING

 

RAMMER

 

 

 PMR85D

Содержание PMR85D

Страница 1: ...Professional Compaction OPERATION MANUAL TAMPING RAMMER PMR85D...

Страница 2: ...ocations 6 1 6 Safety Labels 7 8 1 7 Operating Labels 9 2 OPERATION 10 2 1 Application 10 2 2 Structure 10 2 3 Before Starting 10 2 4 To Start 11 2 5 To Stop 11 2 6 Operation 12 3 MAINTENANCE 13 3 1 P...

Страница 3: ...ssibility of personal injury damage to the equipment or improper service This is the safety alert symbol It is used to alert you to potential personal injury hazards Obey all safety messages that foll...

Страница 4: ...r disable the function of operating controls NEVER use choke to stop engine NEVER operate the machine in areas where explosions may occur ALWAYS remove or disconnect engine spark plug before servicing...

Страница 5: ...and cracks before starting engine Do not run machine if fuel leaks are present or fuel cap or fuel lines are loose If fuel is spilled during refueling wipe it off from the engine immediately and disc...

Страница 6: ...to clean parts especially in enclosed areas Fumes from fuels and solvents can become explosive DO NOT remove air cleaner paper element precleaner or air cleaner cover while operating rammer DO NOT al...

Страница 7: ...6 SAFETY INFORMATION 1 5 Label Locations...

Страница 8: ...comes illegible the cover must be replaced Refer to the Parts Manual for ordering information DANGER Engines emit carbon monoxide operate only in well ventilate area Read the Operation Manual for mach...

Страница 9: ...spring or cover If the spring system cover is removed improperly the springs can eject Guaranteed sound power level in dB A A nameplate listing the model number and serial number is attached to each...

Страница 10: ...uel valve by moving th fuel cock level to the open position Press down the decompression lever Move the throttle control lever to the starter position Pull the recoil starter rope quickly Stop the eng...

Страница 11: ...made up of Power source Clutch Connecting Rod and Operating Handle Fuel Tank that connected via Shock Absorbing Rubber to body Bottom end is made up of Spring Cylinder Sliding part Foot Plate that ram...

Страница 12: ...If the engine has started while listening to explosion sounds return the choke lever slowly to full open position Be sure to perform a warm up run for the period 3 to 5 minutes at low speed while payi...

Страница 13: ...e the compaction force to increase On the contrary a resultant resonance causes the compaction force to decrease damaging the machine 4 Under cold weather the oil in the machine being viscous resistan...

Страница 14: ...rs Every 3 months or 300 hours Check fuel level Check oil level of machine Check fuel line and fittings for cracks or leaks Tighten ramming shoe hardware Check and tighten engine cylinder screws Check...

Страница 15: ...capacity to hold machine see identification plate on machine for weight Use central lifting point a when lifting machine 7 Use trolley kit supplied as optional for short distance transportation 8 Do...

Страница 16: ...ude not uniform or does not strike Operating speed of throttle lever is incorrectly set Set throttle lever to correct position Oil in excess Drain excess oil Bring to correct level Clutch slips Replac...

Страница 17: ...valves Faulty engine stop solenoid if equipped Engine cannot be manually turned Inner parts seized or damaged See authorized Yanmar industrial engine dealer or distributor White or Black Exhaust Smok...

Страница 18: ...6 3 1 Fuel tank Capacity L 2 8 Shoe Size mm in 285x330 11 2x13 0 Ramming System Lubrication 0 8L CD10W 30 Working Size mm Model A B C D E PMR85D 1040 410 703 285 330 Sound Specification According to 2...

Страница 19: ...as not been damaged by accident misuse or abuse Has not been tampered with or repaired by any unauthorized person The owner is responsible for the cost of transportation to and from the authorized rep...

Страница 20: ...reading through this manual thoroughly you will find that you can do some of the regular maintenance yourself However when in need of parts or major service be sure to see your dealer For your conven...

Страница 21: ...nd address of notified body Bei folgender einbezogener Pr fstelle Oficina matriculadora Organisme agr e Measured sound power level Gemessener Schallleistungspegel Nivel de potencia ac stica determinad...

Страница 22: ...n P O Box 38 91280 St PIERRE DU PERRAY FRANCE Tel 33 6 12 70 02 63 E mail intlsales masterpac eu MASTERPAC ENGINEERING CO LTD Add Weisi Road Baohe Industrial Estate Hefei 230051 China Tel 86 551 48466...

Отзывы: