6
Electrical
Requirements
:
Always follow all local electrical codes when installing our water
treatment equipment.
1. Provide an 115v/60Hz properly grounded dedicated electrical
Outlet. (It’s very important that the polarity be correct)
Avoid using outlets that are switch controlled.
2. Maximum amperage required is 5 amps.
3. Make sure the electrical service provides power 24 hours per day.
We recommend installing a
surge protector
to protect unit from
power surges, which are not covered by warranty.
Brine Tank:
1. The brine tank should be located directly beside the water softener
mineral tank.
2. Connect the 3/8" poly tubing to the 3/8” black elbow compression
fitting located on the top left side of the MCA control valve.
See Figure Below.
The brine tank is equipped with a shutoff valve, the float height
was preset at the factory
.
3/8” BRINE LINE
CONNECTION
Содержание MP-CLR-30
Страница 1: ...MP CLR UF Top Mount Water Softeners June 2015 Version Installation and Operation Manual...
Страница 13: ...11...
Страница 19: ...17 ERROR CODES...
Страница 20: ...18...
Страница 21: ...19 CLEAR REFLECTIONS PARTS...
Страница 22: ...20 CLEAR REFLECTIONS PARTS...
Страница 23: ...21 CLEAR REFLECTIONS PARTS...
Страница 24: ...22 CLEAR REFLECTIONS PARTS...
Страница 25: ...23...
Страница 33: ...ERROR CODES...
Страница 34: ......