background image

© 2012, Pinnacle Products International, Inc.

5

Convection Heater User’s Manual

Pre-Lighting Instructions

ASSEMBLY

1. Slide upper housing straight up an off of lower housing, and

remove all of the packed items from inside heater.

2. Remove all packaging protecting heater during shipping.

Retain plastic caps covering inlet and regulator hose for 
storage

3. Save carton and packing materials for later storage.

4. Inspect heater closely for any damage that may have occurred

during shipping. If there is any damage, return the heater to
the place of purchase.

5. Attach 4 (four) of the phillips head screws to the bottom row of

holes in the lower housing (see Figure 3).

6. Slide upper housing over lower housing, lining up the four

remaining screw holes. Insert 4 (four) phillips head screws and
tighten securely (See Figure 4).

7. Follow all Safety Information on pages 2-4.

CONNECTING THE LP CYLINDER

ALL NEW LP CYLINDERS MUST BE PURGED BEFORE
THE FIRST FILLING.

Purging and filling of LP cylinders must
be performed by personnel who have

been thoroughly trained in accepted LP gas industry 
procedures. Failure to follow these instructions may result
in ex plosion, fire, severe personal injury or death.

- To connect hose and regulator assembly, rotate fitting on

hose/regulator COUNTERCLOCKWISE into threads on tank
valve (see Figure 5). Be sure to tighten firmly. Important: Be
sure to position the regulator so that the regulator is horizontal,
also as shown in Figure 5.

- To connect to heater inlet, rotate clockwise and tighten firmly

with a wrench 

NOTE: 

Once the gas connection has been made, air may be

trapped in the gas line. Before lighting the heater it will be neces-
sary to purge any air trapped in the line. Once this is done the
heater will light and operate normally. Purging the gas line will be
necessary every time the gas cylinder is replaced.

CHECKING FOR LEAKS

- To check for leaks, make up a 50/50 solution of dish soap and

water. Apply this solution to all gas connections. If bubbles
appear, there is a leak. If a leak is found, turn off the gas sup-
ply, and re-connect the leaking connection. If the leak persists
after several tries, contact Pinnacle Customer Service at 215-
891-8460.

- The installation of this heater must meet all local codes and/or

gas utility requirements. In the absence of local codes, the
National Fuel Code ANSI Z223.1 should be followed.

- The minimum clearances to any combustible construction 

materials must be maintained at all times (See Page 3).

Figure 5:

Connecting the Hose to Heater Inlet

Figure 3:

Removing Upper Housing

Support Screws
in place

Phillips screws

Figure 4:

Assembly screw placement

WARNING

Review and understand all of the 
warnings in the Safety Information 

section of this manual.

WARNING

NEVER LEAVE HEATER UNATTEND-

ED WHILE BURNING, OR WHILE

CONNECTED TO A FUEL SOURCE

Содержание MH-80V-LPC

Страница 1: ...RE EXPLOSION BURN ASPHYXIATION CARBON MONOXIDE POISONING AND OR ELECTRIC SHOCK ONLY PERSONS WHO CAN UNDERSTAND AND FOLLOW THE INSTRUCTIONS SHOULD USE OR SERVICE THIS HEATER IF YOU NEED ASSISTANCE OR H...

Страница 2: ...ng technique not specifically recommended by Pinnacle is used you must be sure it is safe for you and others You should also insure that equipment will not be damaged or made unsafe by the operating o...

Страница 3: ...ulated gas supply To prevent injury always wear gloves when handling heater Never handle an operating or hot heater as severe burns may result Use heater in accordance with all local codes In the abse...

Страница 4: ...r varies Both factors are 1 The amount of gas in the cylinder of LPG 2 The temperature of the LP tank and its surroundings Propane is safe to use when properly handled Careless handling of the LP cyli...

Страница 5: ...e see Figure 5 Be sure to tighten firmly Important Be sure to position the regulator so that the regulator is horizontal also as shown in Figure 5 To connect to heater inlet rotate clockwise and tight...

Страница 6: ...S 1 Turn Control Knob to the OFF position 2 Rotate valve on cylinder clockwise to close it LIGHTING INSTRUCTIONS MH 200V LPC Before lighting heater turn control valve to LIGHT position Read safety inf...

Страница 7: ...ple Bracket 24 504 0007 24 504 0007 1 13 Spark Plug 24 141 0001 24 141 0001 1 14 Spark Plug Bracket 24 504 0008 24 504 0008 1 15 Connector Outlet 24 507 0015 1 16 Ignitor Wire 24 601 0005 1 17 Outlet...

Страница 8: ...horized retailers or distribu tors AFTER THE PERIOD OF THE ONE 1 YEAR EXPRESS WAR RANTY EXPIRES Pinnacle Products International Inc DIS CLAIMS ANY AND ALL IMPLIED WARRANTIES INCLUDING WITHOUT LIMITATI...

Отзывы: