EN
SET-UP PREPARATION
1.
Unfold the board from the packaging.
C
hoose a smooth and clean surface to unfold board. Roll out the SUP
board until it is laying flat with top side facing up.
2.
Valve operation
F
ollo
w the instructions below for valve operation and correct
inflation and deflation procedures.
T
he board
’
s inflation valve is located near the nose of the board.
To
close off the valve for inflation, make sure that the center valve pin is
in the
“UP”
position.
I
f it is in the
“DOWN”
position, press the valve
pin to
“UP”
position.
T
o open the valve for deflation, press down on the valve pin (need
not to turn it), make sure that the center valve pin is in the
“DOWN”
position,
B
e careful of any sand or debris around the valve area when