
6
Electrical Requirements:
Always follow all local electrical codes when installing our water
treatment equipment.
1. Provide an 115v/60Hz properly grounded dedicated electrical
outlet. (It’s very important that the polarity be correct)
Avoid using outlets that are switch controlled.
2. Maximum amperage required is 5 amps.
3. Make sure the electrical service provides power 24 hours per day.
We recommend installing a
surge protector
to protect unit from
power surges, which are not covered by warranty.
Brine Tank:
1. The brine tank should be located directly beside the water Anion
unit mineral tank.
2.
Connect the 3/8" poly tubing to the 3/8” black elbow quick-connect
fitting located on the top left side of the MCA control valve.
3. Place 2 gallons of water directly into the brine tank.
See Figure Below.
The brine tank is equipped with a shutoff valve, the float height
was preset at the factory
.
3/8” BRINE LINE
CONNECTION
Содержание MP-MCA Series
Страница 1: ...January 2019 MP MCA RESIDENTIAL ANION UNITS Installation and Operation Manual www masterwater com ...
Страница 12: ...11 ...
Страница 13: ...12 ERROR CODES ...
Страница 14: ...13 ...
Страница 20: ...19 ...
Страница 21: ...20 ...
Страница 22: ...21 ...
Страница 23: ...22 ...
Страница 24: ...23 ...
Страница 32: ...ERROR CODES ...
Страница 33: ......