![Masoneilan SVI II ESD Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/masoneilan/svi-ii-esd/svi-ii-esd_installation-and-maintenance-manual_1735323066.webp)
© 2017 Baker Hughes, a GE company, LLC. All rights reserved.
66
|
BHGE
Mounting the SVI II ESD with NAMUR Kits
There are two versions of this kit:
20 and 30 mm
50 mm
20 and 30 mm Mounting
Tools required:
3 mm hex key
4 mm hex key
Refer to Figure 43 for this procedure.
To mount using this kit:
1. Attach the mounting bracket to the valve actuator using four (4) M5 x 0.8 x 10 flat-head
cap screws.
Figure 43 Namur 20/30 mm Mounting Kit
2. Place the indicator disk with metal insert over the valve actuator shaft and secure using
an M6 x 1.0 x 45 socket-head screw.
3. Place the Quarter Turn Mounting Plate into place sliding it through the anti-backlash
spring into the dowel pin at the end of the plate into the hex head screw installed in step 2.
4. Secure the plate to the bracket using four (4) flat head cap screws.
Mounting Bracket
Indicator Disc Bracket
Quarter Turn
Mounting Plate
Содержание SVI II ESD
Страница 4: ...This page intentionally left blank ...
Страница 10: ...This page intentionally left blank ...
Страница 14: ...This page intentionally left blank ...
Страница 100: ...This page intentionally left blank ...
Страница 120: ...This page intentionally left blank ...
Страница 126: ...This page intentionally left blank ...
Страница 160: ...This page intentionally left blank ...
Страница 194: ...This page intentionally left blank ...
Страница 200: ...This page intentionally left blank ...
Страница 204: ...This page intentionally left blank ...
Страница 206: ...This page intentionally left blank ...
Страница 208: ...This page intentionally left blank ...
Страница 216: ...This page intentionally left blank ...