OPERATOR'S MANUAL
ENGLISH
Cod. EKE0002OM
67
Figure 8
Before centering pistons vertically, rotate the flywheel 1 cycle to check its horizontal
centering. There are two fixed rails at the bottom of bale machine. The top two L twist rail can
be adjusted up and down. Move the piston all the way back and start vertical centering of the
piston. Loosen 4 each bolts (10) that secure the two L twist upper rail plates on the baling
room and move the rails vertically. Rotate the flywheel again to move the piston all the way
forward. Adjust the rails vertically and tighten. Ensure that the distance between top twist rails
and vertical wheel bearing is 0,38-0,76 mm. (Figure 9)
Figure 9
Содержание PITAGORA INLINE
Страница 2: ......
Страница 12: ...ENGLISH OPERATOR S MANUAL 12 Cod EKE0002OM PITAGORA INLINE Machine Dimensions Fig1 Fig2 ...
Страница 22: ...ENGLISH OPERATOR S MANUAL 22 Cod EKE0002OM ...
Страница 25: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 25 11 12 13 14 15 ...
Страница 26: ...ENGLISH OPERATOR S MANUAL 26 Cod EKE0002OM 16 17 18 19 20 21 22 23 ...
Страница 65: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 65 Figure 4 Figure 5 ...
Страница 69: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 69 Figure 1 ...
Страница 70: ...ENGLISH OPERATOR S MANUAL 70 Cod EKE0002OM Figure 2 Figure 3 ...
Страница 73: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 73 Fiigure 3 ...
Страница 75: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 75 Figure 2 ...
Страница 76: ...ENGLISH OPERATOR S MANUAL 76 Cod EKE0002OM Figure 3 ...
Страница 79: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 79 Figure 2 ...