10
Check all external fasteners at regular intervals.
2.1 Preparing the Machine for First Use
To prepare your machine for first use:
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Masalta dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
2.2 Locating Light Tower
Positioning
the machine
WARNING
Electric shock or equipment damage hazards.
The tower extends up to 3.7m/5.0m (ML42/ML44). and
could interfere with overhead wires and obstructions.
Position the machine on a firm, flat surface clear of
overhead wires and obstructions.
Make sure that there is enough area for outrigger
extensions to be fully extended.
Ground
Connection
Function
For maximum light coverage, locate the Light Tower at ground level
or in a spot higher than the area being lighted.
A ground connection
is located on the machine
frame.
The ground connection is used for electrically grounding the Light Tower when
necessary to comply with the National Electrical Code and other federal, state,
and local regulations. For grounding requirements in your area, consult with a
qualified electrician, electrical inspector, or local agency having jurisdiction
over electrical compliance.
If the Light Tower is used at a construction site, there may be additional
regulations which must be observed.
OPERATION