17.  ALTERNATIVE INSTALLATION APPLICATION 
 

DT

SB

SB

DT

DT

SB

SB

DT

1

2

4

3

 

 

(SB: Suction

 Below

 

– DT: Discharge

 Top 

 

No

: 3

 

Figure 11:

 Alternative Installation Application

Содержание KMU-V Series

Страница 1: ...Revision No 02 June 2018 Vertical High Pressure Multistage Centrifugal Pumps KMU V SERIES KMU V Series ATEX Version OPERATING MANUAL...

Страница 2: ...4 35 AB Al ak Gerilim Y netmeli i 2014 30 EU Electromagnetic Compatibility Directive 2014 30 AB Elektromanyetik Uyumluluk Y netmeli i EUP 2009 125 EC Electric Used Products Directive Elektrik Kullanan...

Страница 3: ...TY PRECAUTIONS In order to minimize the accidents during the mounting and putting into service of the pump the following rules have to be applied 1 Do not work without taking safety measures relevant...

Страница 4: ...mp org Figure 1 Pump Label ATEX Version Pump Label 2 2 Performance Information Actual performance of the pump can be obtained from the order page and or from the test report This information is given...

Страница 5: ...cannot touch them Moving components of the pump such as coupling must be covered so that one cannot touch them Those covers must not be dismounted while the pump is running Dangers that results from...

Страница 6: ...econdary component in accordance with DIN 740 is used A coupling guard is given in accordance with EN 953 in case of the pump group includes the coupling and chassis Pump can only be run with a coupli...

Страница 7: ...sand stone wood piece etc get into the pump Do not take off this gasket until the installation is completed Start the installation of piping from the pump side Do the necessary assembling and welding...

Страница 8: ...t coupling other than the original type installed on pumping group 6 5 2 Method of coupling alignment In order to make the alignment of the coupling it is required to have at least two pieces of about...

Страница 9: ...g an eye on the amperage open the valve with care regarding that it should not exceed the value indicated on pump s label After opening the valve completely check the pressure from the pump exit manom...

Страница 10: ...does not depend on the quality of shaft finishing 8 1 4 Coupling In KMU V type pumps are used rigid coupling 8 1 5 Drive Apply to the operating instructions of the motor manufacturer 8 1 6 Auxiliary C...

Страница 11: ...and pump foot Seperate the pump from the installation Before starting to disassemble the pump brand suction discharge and stage casing and mark confronting locations for the purpose of convenience dur...

Страница 12: ...tures are high Too much too little or improper lubrication Increase in axial forcing Change the oil decrease or increase its quantity Clean the balance holes on the impeller disc Excessive leakage fro...

Страница 13: ...Type 3 4 5 6 7 8 9 10 11 12 13 14 KMU V 25 145 177 209 241 273 305 337 369 401 433 465 497 KMU V 32 145 177 209 241 273 305 337 369 401 433 465 KMU V 40 162 202 242 282 322 362 402 442 KMU V 50 162 2...

Страница 14: ...ollowing formula 2 2 allowable maximum actual 2 allowable maximum actual M M F F In here F and M arearithmetic sum of the loads for each flange at the pump level without regard of the algebraic signs...

Страница 15: ...nk B Large radius elbow C Minimum slope is 2 cm m D Fittings flanges etc E Non return valve F Foot valve G Suction valve H Reducer Discharge valve J Electrical connection K Insulated cable L Concrete...

Страница 16: ...Imbus Bolt 04 Stage Casing 101 Bronze Journal Bearing 341 Imbus Bolt 10 Final Stage Diffuser 102 Shaft Nut 360 Stud 17 Base Plate 210 Key Standard Impeller 380 Setscrew 18 Journal Bearing Cover 211 Ke...

Страница 17: ...Mas Grup 15 17 ALTERNATIVE INSTALLATION APPLICATION DT SB SB DT DT SB SB DT 1 2 4 3 SB Suction Below DT Discharge Top No 3 Figure 11 Alternative Installation Application...

Страница 18: ...Mas Grup 16 18 KMU V DRAWING FOR DISMANTLING Figure 12 KMU V Drawing For Dismantling...

Страница 19: ...ne and Its Correction 6 Figure 7 Angular Misalignment in Vertical Plane and Its Correction 6 Figure 8 KMU V Pump Dimensions Figure 11 Figure 9 Sample Plumbing 13 Figure 10 KMU V Sectional Drawing 14 F...

Страница 20: ...17 Tuzla STANBUL T RK YE Tel 90 216 456 47 00 pbx Fax 90 216 455 14 24 Ankara Regional Directorate A a ve ler Mah 1329 Sok No 6 9 ve ler ANKARA TURKEY Tel 90 312 472 81 60 67 Fax 90 312 472 82 51 Fac...

Отзывы: