10
Rail Light user manual
1. See Figure 4 and Figure 5.
Note the position of the
drilling guide groove (A) in
the channel on the lower
side of the luminaire. Drill
or grind a flat countersink
36 mm in diameter,
centered on the guide
groove and flush with the
guide groove surface at the
bottom of the channel,
maximum 250 mm (9.5 in.)
from the end of the
luminaire.
2. Drill a hole 25 mm in diameter, centered on the countersink, through the
luminaire housing.
Mount the membrane
nipple ready for cable
entry as shown in Figure
5. Cable must be passed
through the nipple for
waterproof and safe cable
entry.
Figure 5: Luminaire after drilling
Figure 6: Membrane nipple
Содержание Architectural Rail Light
Страница 1: ...m a r ti na r c h i t e c t u r a l installation guide and user manual Rail Light ...
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ...www martin architectural com Olof Palmes Allé 18 8200 Aarhus N Denmark Tel 45 8740 0000 Fax 45 8740 0010 ...