background image

Document No: IND2-IOM 

Date: 08/14/20 

 

 

 STANDARD 2 (STD2), HIGH VELOCITY 2 (HV2), EXTRA POWER 2 (EP2) 

AND ETL SANITATION CERTIFIED INDUSTRIAL SERIES 

 

 

Installation, Operation and Maintenance Manual 

Please read and save these instructions. Read carefully before attempting to assemble, install, operate, or maintain 

the product described. Protect yourself and others by observing all safety information. Failure to comply with these 

instructions could result in personal injury and/or property damage. Retain these instructions for future reference. 

 

OVERVIEW 

 

Mars Air Curtains are 

designed to cover door 

openings,  providing both 

temperature 

control/environmental 

separation and flying insect 

control, when the building’s 

doors are opened.  Typical 

installation heights are: 

Standard 

Series 

(Environmental Separation  up to 12’,  Flying Insect 

Control up to 10’), High Velocity 2 Series (Environmental 

Separation up to 14’, Flying Insect Control up to 12’), and 

Extra Power  2  Series (Environmental up to 16’, Flying 

Insect Control up to 14’).  All  ETL Sanitation  Certified 

Series should be mounted at 7’ for Flying Insect Control. 

The units are typically wall mounted horizontally above 

the door opening. They can also be suspended from the 

ceiling or vertically mounted alongside the opening. The 

units are ETL Listed for either an inside or outside mount. 

Heated units must be mounted on the inside or the 

protected side of the opening. The motors used  in the 

Standard 2, High Velocity 2 and Extra Power 2 Series are 

1/2HP, 1HP and 3HP, respectively. The ETL Sanitation 

Series utilizes 1/2HP and 1HP motors.  

 

The  Standard  2, High Velocity  2  and Extra Power  2 

Series come standard with an air intake grille. They can 

also be configured with an aluminum mesh air intake filter 

instead of the air intake grille or in conjunction with it.  

GENERAL SAFETY 

INFORMATION

  

Use this product only in the 

manner intended  by the 

manufacturer. If you have 

any questions, contact the 

manufacturer. Only qualified 

personnel should install this 

product. Installing personnel 

should have a clear 

understanding of these 

instructions and should be 

aware of general safety precautions.  Improper 

installation can result in electric shock, possible injury 

due to coming in contact with moving parts, as well as 

other potential hazards. 

 

 

 WARNING 

When servicing the product, motor may be hot enough 

to cause pain or injury. Allow motor to cool before 

servicing. 

 

 WARNING 

To reduce the risk of fire, electric shock,  or injury to 

persons, observe the following. 

A. Always disconnect, lock and tag power source before 

installing or servicing product. 

B. Installation work or electrical wiring must be done by 

qualified person(s) in accordance with all applicable 

codes and standards, including fire-rated construction. 

C. The combustion airflow needed for safe operation of 

fuel burning equipment in the area may be affected by 

the product’s operation. Follow the heating equipment 

manufacturer’s guideline and safety standards, such as 

those published by the National Fire Protection Agency 

(NFPA), the American Society of Heating, Refrigeration 

and Air Conditioning Engineers (ASHRAE) and local 

code authorities. 

D. When cutting or drilling into a wall or ceiling, be careful 

not to damage electrical wiring and other hidden 

utilities.

 

Содержание STD2 Unheated 2 Series

Страница 1: ...thout notice Such revisions do not entitle the buyer to corresponding changes improvements additions or replacements for previously purchased equipment MARS AIR SYSTEMS LLC GARDENA CA USA STD2 Unheate...

Страница 2: ...tice Such revisions do not entitle the buyer to corresponding changes improvements additions or replacements for previously purchased equipment MARS AIR SYSTEMS LLC GARDENA CA USA Table of Contents Pa...

Страница 3: ......

Страница 4: ...A Proudly Made in the USA Note All STD2 1 motor units up to 48 are shipped with the Motor Fan Assembly MFA factory installed inside the air curtain housing For all other models the MFA are shipped loo...

Страница 5: ......

Страница 6: ...nged door type door limit switch installation FIG 1 2 Use light gauge materials when field fabricating brackets to activate and deactivate the door limit switch s FIG 2 Figure 2 also shows the typical...

Страница 7: ...6 STD SHOWN 3 Extended Wall Mounting For Tandem Mounting of air curtain over sectional style door use either wall mounting angle brackets or threaded rods 4 Top Mounting Brackets For overhead installa...

Страница 8: ...itation Series utilizes 1 2HP and 1HP motors The Standard 2 High Velocity 2 and Extra Power 2 Series come standard with an air intake grille They can also be configured with an aluminum mesh air intak...

Страница 9: ...nside the product to align with the stud spacing All hardware is field provided by others 4 Mount the product such that the discharge is 1 above the opening and all obstacles FIG 1 Note If the product...

Страница 10: ...lied are wired correctly E Check that the inlet air supply and the discharge air supply are free of obstructions F Check that all air filter s and or air intake grille s are in place and installed pro...

Страница 11: ...required for enclosure motor wheel and other components to minimize damage caused by exposure to the outdoor elements Contact factory for special construction and costing Freezer and Cooler Installat...

Страница 12: ...on on intake or discharge Remove obstruction or move air curtain Power leads out of polarity Switch power leads to correct polarity 3 phase models only Blower motor rotating below normal speed Apply p...

Страница 13: ...ma 1 1 115 1 1 6 2 4 03 015 7124 1096 Genteq Nema 1 1 208 230 1 6 5 9 2 03 015 Nidec Nema 1 1 208 230 1 4 3 6 5 03 014 K55BWJZB 2362 US Nema 1 1 115 1 1 2 1 03 015 US Nema 1 1 208 230 1 3 2 6 3 Black...

Страница 14: ...omer may be responsible for transportation charges associated with replacement of failed part Mars does not warrant uninterrupted or error free operation of Mars product Under no circumstance is Mars...

Страница 15: ...DES A Air curtains for pedestrian entrances B Air curtains for vehicular entrances C Air curtains for large loading dock doors 1 2 RELATED SECTIONS A Section 05 50 00 Metal Fabrications Concealed stee...

Страница 16: ...ol Panels F UL 1995 CSA 22 2 UL Standard for Safety Heating and Cooling Equipment Intertek Testing Services Listed for US and Canada G UL 2021 CSA 22 2 Standard for Fixed and Location Dedicated Electr...

Страница 17: ...sh product specified two samples minimum size 6 25 inches 160 mm square representing actual product color and patterns G Manufacturer s Certificates Certify products meet or exceed specified requireme...

Страница 18: ...ns and substitutions C Requests for substitutions will be considered in accordance with provisions of Section 01 33 00 2 2 AIR CURTAIN ASSEMBLIES A Motor Fan Assembly Design for easy removal assembly...

Страница 19: ...e row by 10 5 8 inches high including discharge nozzle by width of unit plus 10 inches for manifolds 2 Mounting a Unheated Inside Mount b Heated Inside Mount c Unheated Outside Mount d Mount Location...

Страница 20: ...nimum of 300 fpm 1 53 m s at 3 feet 914 mm from the floor 4 Air Inlet Grille and Filters a Location Front b Type Fixed air intake grille 1 Filter Aluminum mesh 1 4 inch 6 4 mm washable c Type Filter O...

Страница 21: ...from floor 4 Air Inlet Grille and Filters a Location Front b Speed 2550 cu ft min 1200 L s minimum per motor fan assembly 1 Type Fixed air intake grille 5 Sound Pressure Level At 10 feet 3 m From Noz...

Страница 22: ...to air curtain housing 9 Supply and return fittings on top of casing 10 Thermostat Wall mounted 110 Volt operation with heater on off selection 11 Thermostat Wall mounted 208 230 Volt operation with...

Страница 23: ...assive Adaptive e Factory Integrated temperature control sensors No external thermostat required f Summer Winter modes g 24 7 timer h Maintenance schedule alerts i Status display showing date time tem...

Страница 24: ...20 amps limit switch to control air curtain s as follows Automatic on off control activates air curtain when door is opened and turns off when door is closed Provide limit switch for direct control on...

Страница 25: ...tight without warp or rack C Anchor air curtains securely in place to supports D Coordinate with sheet metal flashing as specified in Section 07 62 00 E Install joint sealants as specified in Section...

Страница 26: ...manufacturer s instructions and as approved by Architect C Remove and replace damaged components that cannot be successfully repaired as determined by Architect 3 5 PROTECTION A Protect materials and...

Страница 27: ...evisions do not entitle the buyer to corresponding changes improvements additions or replacements for previously purchased equipment MARS AIR SYSTEMS LLC GARDENA CA USA Reference Links Link Descriptio...

Отзывы: