![Mars Air Systems N2 Unheated 2 Series Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/mars-air-systems/n2-unheated-2-series/n2-unheated-2-series_manual_1730634017.webp)
Mars Standard Series 2-CSI-Spec
Revised 2/3/2021
MARS AIR SYSTEMS, LLC
23 34 33 – 3
2.
Storage and handling requirements and recommendations.
3.
Installation methods.
C.
Shop Drawings: Include plans, elevations, sections, and details, indicating dimensions,
tolerances, materials, fasteners, hardware, finish, piping, electrical wiring diagrams,
options, and accessories.
D.
LEED Submittals: Provide documentation of how the requirements of Credit will be met:
1.
List of proposed materials with recycled content. Indicate post-consumer
recycled content and pre-consumer recycled content for each product having
recycled content.
2.
Product data and certification letter indicating percentages by weight of post-
consumer and pre-consumer recycled content for products having recycled
content.
E.
Selection Samples: For each finish product specified, two complete sets of color chips
representing manufacturer's full range of available colors and patterns.
F.
Verification Samples: For each finish product specified, two samples, minimum size 6.25
inches (160 mm) square, representing actual product, color, and patterns.
G.
Manufacturer's Certificates: Certify products meet or exceed specified requirements.
H.
Operation and Maintenance Manual: Submit manufacturer's operation and maintenance
manual, including operation, maintenance, adjustment, and cleaning instructions, trouble
shooting guide, parts list, and electrical wiring diagrams.
1.5
QUALITY ASSURANCE
A.
Manufacturer Qualifications: Minimum ten years documented experience producing the
products specified in this Section
B.
Installer Qualifications: Minimum five years documented experience installing products
specified in this Section
1.6
DELIVERY, STORAGE, AND HANDLING
A.
Store products in manufacturer's unopened packaging until ready for installation.
B.
Store in a dry, heated storage area until installation of products.
C.
Protect materials and finish from damage during handling and installation.
1.7
SEQUENCING
A.
Ensure that locating templates and other information required for installation of products
of this section are furnished to affected trades in time to prevent interruption of
construction progress.