maintenance schedule

Maintenance Service

Monthly

Semi-annually

Seasonal Startup or Annually

Inspect General Condition and Operation

x

x

Observe Operation of:

Mechanical–motor, fan and drive mechanism

x

x

Makeup valve (if equipped)

x

x

Inspect for unusual noise or vibration

x

x

Inspect and Clean:

Air inlet

x

x

PVC drift eliminators

x

x

Distribution basin, nozzles and collection basin

x

x

Fan motor exterior

x

x

Check:

Collection water basin level

x

x

Blowdown–adjust as required

x

x

Geareducer Drive (if equipped):

Check for loose fasteners including oil drain plug

x

Check for / repair oil leaks

x

x

Check oil level

x

x

Change oil

R

Make sure vent is open

x

x

Check driveshaft or coupling alignment

x

Check for loose driveshaft or coupling fasteners

x

Check driveshaft or coupling bushings or flex element for unusual wear

x

x

Lube lines (if equipped):

Check for oil leaks in hoses or fittings

x

R

x

Belt drive (if equipped):

Fan shaft bearing lubrication (every 3 mo.)

every 3 months

every 3 months

Check and tighten support fasteners

x

Check shaft, sheave and belt alignment

x

Check belt tension and condition

x

x

Check sheave bushing fastener torque

x

Fan:

Check and tighten blade and hub fasteners

x

Check fan blade pitch and tip clearance

x

Inspect and touch up fan hub

x

Motor:

Lubricate (as required)

R

Check mounting bolts for tightness

x

Operate at least

3 hours a month

3 hours a month

3 hours a month

Inspect and touch up all metal surfaces

x

Structure, Bearing Housing, Sheaves, Coupling Flange:

Inspect/tighten all fasteners

x

x

Inspect and touch up all metal surfaces

x

R

 — Refer to Component User Manual

Note:

  It is recommended at least weekly, that the general operation and condition be observed. Pay attention to 

any changes in sound or vibration that may signify a need for closer inspection.

Содержание NC fiberglass

Страница 1: ...NC fiberglass cooling tower INSTALLATION OPERATION MAINTENANCE uk_Z0702489_D ISSUED 8 2018 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT user manual ...

Страница 2: ...wn Instructions 19 Prolonged Shutdown 19 Maintenance Schedule 20 Additional Services 21 Troubleshooting 22 The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product Note Indicates presence of a hazard which can cause severe personal injury death or substantial prope...

Страница 3: ...ut the operation and or maintenance of this cool ing tower and you don t find the answers in this manual please contact your Marley sales representative When writing for information or when ordering parts please include the serial number shown on the cooling tower nameplate Safety First The location and orientation of the cooling tower can affect the safety of those responsible for installing oper...

Страница 4: ...rchitect to certify that the location of the tower is in compliance with applicable air pollution fire and clean air codes Tower Assembly YourMarleysalesengineerisabletoprovideforthetowerassemblybyMarley s construction division or through a qualified subcontractor Our subcontrac tors provide safe efficient assembly which complies with all requirements for warranty protection of your tower by SPX C...

Страница 5: ...ng tower commissioning when the tower is dry and the ambient air temperature is cool Do not start the motor more than four to five times per hour Short cy cling the tower will cause fuses breakers or O L s to operate and will decrease motor life When using a two speed starter Motor rotation must be the same at slow speed and high speed Single winding motor requires a starter with a shorting contac...

Страница 6: ...when the cooling requirement can be satisfied at reduced speeds To benefit from these advantages it is important that the drive be installed correctly Marley supplies VFD and VFD controls specifically designed for our cooling products If you have purchased a Marley VFD and or controls package please follow the instructions in the User Manual for that system Most VFD problems can be avoided by purc...

Страница 7: ... from below If rotation is backwards shut off the fan and reverse two of the three primary leads supplying power to the motor If tower is equipped with a two speed motor check for proper rota tion at both speeds Check also to see that starter is equipped with a 20 second time delay which prevents direct switching from high speed to low speed If the fan is intended to be reversed for deicing purpos...

Страница 8: ...ater basin entire hot water basin and hot water inlet Make sure that cold water suction screens are clear and properly installed 4 For NC8401 thru NC8405 fill the water system to an approximate depth of 178mm in the depressed section of the cold water basin For NC8407 thru NC8414 fill the water system to an approximate depth of 203mm in the depressed section of the cold water basin This is the rec...

Страница 9: ...ium hypochlorite to a level of 4 to 5 mg L free chlorine residual at a pH of 7 0 to 7 6 The chlorine residual must be held at 4 to 5 mg L for six hours measurable with standard com mercial water test kits If the cooling tower has been in operation and then shut down for a duration of time and not drained perform one of the two previous biocidal treatment programs directly to the cooling water stor...

Страница 10: ...same extent as the wet bulb For example an 11 C reduction in wet bulb may result in only an 8 C reduction in cold water temperature 3 Water Flow Rate Increasing the water flow rate m3 hr will cause a slightelevationincoldwatertemperature whilereducingthewaterflow rate will cause the cold water temperature to lower slightly However at a given heat load see formula above m3 hr reductions also cause ...

Страница 11: ... Marley Technical Report H 001 Cooling Tower Energy and its Management available from your Marley sales representative or you can download a copy from Marley s website at spxcooling com Freezing Weather Operation During operation in subfreezing weather the opportunity exists for ice to form in the colder regions of the tower Your primary concern is to prevent the formation of destructive ice on th...

Страница 12: ... as outlined in Item 4 under Tower Operation on page 10 However in towers of more than one cell the limiting temperature established applies to the water temperature of the cell or cells operating at the highest fan speed not necessarily the net cold water temperature produced by the entire tower 2 As cold air enters the louvers it causes the falling water to be drawn inward toward the center of t...

Страница 13: ...reezing Several methods are used to combat this Consult your Marley sales representative for more information Unless some means of freeze prevention is incorporated into your system the tower basin and exposed pipework should be drained at the beginning of each wintertime shutdown period It is recommended that you discuss your freeze prevention options with your local Marley sales representative C...

Страница 14: ... with zinc In working with your water treatment supplier it is impor tant that you recognize the potential effects on zinc of the specific treatment program you choose Blowdown Acoolingtowercoolswaterbycontinuouslycausingaportionofittoevaporate Although the water lost by evaporation is replenished by the makeup system it exits the tower as pure water leaving behind its burden of dissolved solids t...

Страница 15: ...nagementplan WMP andimplementationofmaintenance proceduresareessentialtopreventthepresence disseminationand amplification of Legionella bacteria and other waterborne contami nants throughout premise plumbing Before operating the cooling tower the water management plan and maintenance procedures must be in place and regularly practiced In addition the following steps are recommended Do NOT attempt ...

Страница 16: ... contact your Marley sales represen tative For help identifying the sales representative in your area visit spxcooling com replocator Schedule of Tower Maintenance Included with this instruction packet are separate User Manuals on each major operating component of the tower and it is recommended that you read them thoroughly Where discrepancies may exist the separate User Manuals will take precede...

Страница 17: ...ate method for tensioning V belts Check with you local belt supplier Sheave Alignment The motor sheave is to be positioned as close as possible to the motor in order to minimize torque on the motor bushings The motor and fan sheaves may have grooves that are not used The bot tom surface of the motor and fan sheaves must be aligned within 3mm of each other and level within 3mm in 300mm in order to ...

Страница 18: ... may have accumulated Check for any buildup of silt on the floor of the cold water basin Mentally note the amount if any so future inspections will enable you to determine the rate at which it is forming Every 3 months Lubricate fan shaft bearings While rotating equipment by hand grease the bearings with lithium based grease until a bead forms around the seals Mobil SHC 460 grease is recommended S...

Страница 19: ...en as required Fan Check fan assembly bolting and tighten as required Use torque settings prescribed on the fan nameplate Refer to fan user manual Fan Motor Clean and lubricate motor if required at close of each operating season Refer to motor manufacturer s recommendations Does not apply to motorswithsealedbearings Checkmotoranchorboltsandtightenasrequired Do not start motor before determining th...

Страница 20: ...x element for unusual wear x x Lube lines if equipped Check for oil leaks in hoses or fittings x R x Belt drive if equipped Fan shaft bearing lubrication every 3 mo every 3 months every 3 months Check and tighten support fasteners x Check shaft sheave and belt alignment x Check belt tension and condition x x Check sheave bushing fastener torque x Fan Check and tighten blade and hub fasteners x Che...

Страница 21: ...complete stock of all parts and components is maintained at one or more of the various Marley plants In cases of emergency they can normally be shipped within 24 hours by air freight if necessary However you would obviously benefit from anticipating your need in advance thus avoiding the cost of special handling Be sure to mention your tower serial number from the tower nameplate when ordering par...

Страница 22: ...cket fits or bearing Rotor unbalance Rebalance Cooling fan hitting end bell guard Reinstall or replace fan Motor runs hot Wrong voltage or unbalanced voltage Check voltage and current of all three lines against nameplate values Overload Check fan blade pitch See Fan User Manual Check for drag in fan drivetrain as from damaged bearings Wrong motor RPM Check nameplate against power supply Check RPM ...

Страница 23: ... shaft with dial indicator Replace if necessary Fan noise Blade rubbing inside of fan cylinder Adjust cylinder to provide blade tip clearance Loose bolts in blade clamps Check and tighten if necessary Scale or foreign substance in circulating water system Insufficient blowdown See Water Treatment section of this manual Water treatment deficiency Consult competent water treating specialist See Wate...

Страница 24: ... RESERVED In the interest of technological progress all products are subject to design and or material change without notice SPX COOLING TECHNOLOGIES UK LTD 3 KNIGHTSBRIDGE PARK WORCESTER WR4 9FA UK 44 1905 750 270 ct fap emea spx com spxcooling com NC Fiberglass US E R MAN UAL ...

Отзывы:

Похожие инструкции для NC fiberglass