Mark GSW+ Скачать руководство пользователя страница 2

1) General recommendations

 

During the annual maintenance, it is necessary to check and control the heat exchanger of heater.  

It contributes to maintain product’ performances and safety.

 

The inspection must be done the same way for all units which have a condensing heat exchanger. 

The inspection must be realized by qualified personnel only. 

Heat exchanger maintenance can be made without difficulties, which implies a short service interruption.  

Use only the equipment specified in this documentation.

 

2) Cleaning steps 

Turn off the unit, switch the power off, and turn off the gas supply before any intervention.  

A) 

Disconnect the ignition and ionization electrodes. 

B) 

Disconnect the power cable of the burner fan and control cable.   

C) 

Remove temporarily the flexible between the solenoid gas valve and the venturi system.  

D) 

Take off the four M6 nuts with a socket spanner or 10 mm closed-end wrench. Keep the nuts on hand.  

E) 

Remove carefully the burner door and keep it on safety place.  

F) 

Inspect the burner door : 

 

-Gasket, change it each time you open the door to ensure the sealing of the combustion chamber   

 

-State of insulation : tear, break, water absorption  

 

-State of burner surface  

Содержание GSW+

Страница 1: ...Technical documentation Heat Exchanger maintenance CAU MTG Maintenance of the heat exchanger Wartung des W rmetauschers EN MARK GSW 0660325 DE...

Страница 2: ...documentation 2 Cleaning steps Turn off the unit switch the power off and turn off the gas supply before any intervention A Disconnect the ignition and ionization electrodes B Disconnect the power cab...

Страница 3: ...he back of the heat exchanger to avoid irreparable damage G Vacuum the combustion residues H Clean with a nylon brush on a circular way DO NOT use metallic brush to avoid any damages I Vacuum the rema...

Страница 4: ...il the water get clear and transparent O Refit the syphon and full it with clear water in order to prepare the first start up P Refit the burner door tighten the four nuts without forcing them Q Conne...

Страница 5: ...beginnen das Ger t aus und schalten Sie die Elektroversorgung des Ger tes und die Gaszufuhr ab A Nehmen Sie die Steckerverbindung auf der Z ndelektrode und der Ionisationselektrode ab B Nehmen Sie di...

Страница 6: ...en Sie mit dem Staubsauger die Verbrennungsr ckst nde auf H Reinigen Sie mit kreisenden Bewegungen das Ger t mit einer Nylonb rste Verwenden Sie KEINE Metall b rste um Sch den jeglicher Art zu vermeid...

Страница 7: ...us bis das Wasser klar und sauber ist O Bringen Sie den Siphon wieder an und f llen Sie es mit Wasser um die Inbetriebnahme vorzubereiten P Bringen Sie die Brennereinheit wieder an und ziehen Sie die...

Страница 8: ...GI BELGIQUE TELEFOON 32 0 3 6669254 FAX 32 0 3 6666578 info markbelgium be www markbelgium be MARK DEUTSCHLAND GmbH MAX PLANCK STRASSE 16 46446 EMMERICH AM RHEIN DEUTSCHLAND TELEFON 49 0 2822 97728 0...

Отзывы: