PACKAGING
Optional flightcase for 2 units
1. Before packed, make sure power is off, and wait for at least 20mins for cooling down.
2. Before clean the fixture, make sure X,Y axis protect lock closed.
3. After packed by plastic bag, high-lift the fixture with two handles besides the product. put
the product into the fly-case up-side-down.
4. After packed the product, put the accessory into the accessory case, then closed and lock the
fly-case.
5. Fly-case only up stacked two layers. Prohibited upside down
In order to protect the light, there is a protect lock; During the transport , the lock will closed
keeping the item in safety state.
Note: Before unpacking check the damage is whether due to the transportation or not, if
you find any such damage, please do not use this item, and contact with the dealer
or manufacturer as soon as possible.
1. Open the fly-case, and discover the inside plastic bag.
2. High-lift the product by two handles beside the bottom base and move it out.
3. Before power on, make sure you have opened the X, Y axis lock!
BEAM 195
can be placed on the stage, or mounted in an arbitrary direction of the truss.
Two fast locks system could fix the item easily
1. Before installation must verify the fast lock is keep in good state, and can withstand at least
10 times the weight of product. Verify that the truss can withstand at least 10 times of the
total weight of the product and accessory equipments.
2. Fix the hang fixture into the hole, which located on the base of the price.
Seize handle of fasteners, clockwise rotate 1/4 turn and lock. Installed other one fastener
in the same method.
3. Using the safety cable which can withstand 10 times the weight of the equipment.
4. INSTALL STANDARD
3.2 TRANSPORT PROTECT LOCK
3.3 ABOUT PACK STAGE
3.4 UNPACKING
4.1 INSTALL LOCK
4.2 EQUIPMENT FIXED
BEAM 195 User Manual/Manual de uso Page 4
EN
Содержание beam 195
Страница 1: ...Rev 16 02 01 BEAM 195 User Manual Instrucciones de Usuario...
Страница 2: ......
Страница 27: ......