![Marine Rescue Technologies sMRT AU10 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/marine-rescue-technologies/smrt-au10/smrt-au10_user-manual_1727356014.webp)
14
MRT Ltd. © 2014
sMRT AU10 User Manual v1.8
5.1 Testing the sMRT AU10
A full system test is performed prior to the sMRT AU10 being installed into
an MRT approved PFD. The device is
[OFF]
when shipped in a PFD and
needs to be configured in the
[READY]
state prior to use. A full system test
should also be performed.
WARNING:
After deployment into active service, a regular full
system test of the sMRT AU10 should be performed every 3 months.
Do not test the device more than once per month as this could affect
battery performance in an emergency. MRT also mandates each
device is returned to MRT, or an authorised service agent, for annual
servicing and recertification.
Low Power Function Test Mode: Battery Testing
Ensure the
ARMING SWITCH
is in the
[OFF]
position.
1. Press and hold the round rubber
ACTIVATION BUTTON
to
activate function test mode.
2. Observe the
ANTENNA
LED
:
a.
GREEN LED
= Batteries OK
b. No
LED
= Battery recertification required
c.
RED LED
= Battery recertification required
3. To cancel function test mode and the battery function test:
a. Stop pressing the
ACTIVATION BUTTON
, or
b.
Lift the
RUBBER O-RING
up and over the
ARMING
SWITCH
, push the
ARMING SWITCH
down, then
immediately up to cancel the function test.
Содержание sMRT AU10
Страница 1: ...sMRT AU10 790000024_sMRT AU10 User Manual Version 1 8_20140616 June 2014 User Manual ...
Страница 19: ...sMRT AU10 User Manual v1 8 MRT Ltd 2014 19 7 Declaration of Conformity ...
Страница 22: ...22 MRT Ltd 2014 sMRT AU10 User Manual v1 8 Please list the serial numbers from products purchased ...
Страница 36: ...36 MRT Ltd 2014 sMRT AU10 User Manual v1 8 13 Technical Specifications ...