- 9 -
Step 10
Step 11
Place the bottom portion of the wall plate to the
reference line and mark the four (4) lag bolt
mounting points through the wall plate slots on
the wall (Figure 10).
Level the wall plate with the reference arrow
pointing up to the ceiling (Figure 11).
Mounting Surfaces
Wood studs
:
Drill four (4) ¼" pilot holes to the
marked
wall.
Concrete wall
: Drill four (4) 3/8” pilot holes to the
marked
wall.
16"
16"
Figure 10
Figure 11
Wooden Studs
Drill Gun
Pilot Holes
Level
Mounting Slots
Wall Plate