Maple Systems HMI5056T Скачать руководство пользователя страница 2

2

Sil ver Plus Se ries

1010-1006, Rev 01

In tro duc tion

Thank you for purchasing a Maple Systems Silver Plus Series OIT.  You have selected a
rugged, reliable, and powerful operator interface for your application.  This booklet
describes the steps necessary to ensure easy installation of your Silver Plus Series OIT. 

Please read this booklet carefully.

Static Aware ness

It is best NOT to remove the rear cover on the OIT.  When the rear cover is removed the
circuitry inside is exposed to possible damage by electrostatic discharge during handling. 
Minimize the possibility of electrostatic discharge by:

Discharging personal static by grounding yourself prior to handling the OIT.

Handling the OIT at static-free, grounded work station.

Connecting the chassis of the OIT to a clean ground.

Placing the OIT into an anti-static bag during transport.

Un pack ing  the  Unit

Carefully unpack the OIT.  Please read any instructions or cautions that appear on the
shipping container.  Check all material in the container against the enclosed packing list. 
Maple Systems, Inc., will not accept responsibility for shortages against the packing list
unless notified within 30 days.  The equipment and its accessories were inspected and tested
by Maple Systems before shipment; all of the equipment should be in good working order. 
Examine the equipment carefully; if any shipping damage is evident, notify the carrier
immediately.  You are responsible for claim negotiations with the carrier.  Save the shipping
container and packing material in case the equipment needs to be stored, returned to Maple
Systems, or transported for any reason.

War ranty

Maple Systems warrants each product to be free from electrical and mechanical defects in
materials and workmanship for a period of two years from the date of shipment.  This
warranty does not apply to defects in the Products caused by abuse, misuse, accident,
casualty, alteration, negligence, repair not authorized by Maple Systems, use on current or
voltages other than specified by Maple Systems, or application or installation not in
accordance with published instruction manuals.  This warranty is in lieu of any other
warranty either expressed or implied.

Maple Systems’ liability is limited to the repair or replacement of the Product only, and not
costs of installation, removal, or damage to user’s property or other liabilities.  If Maple
Systems is unable to repair or replace a nonconforming Product, it may offer a refund of the
amount paid to Maple Systems for such Product in full satisfaction of its warranty
obligation.  Maximum liability of Maple Systems is the cost of the Product.

Information furnished by Maple Systems, Inc., is believed to be accurate and reliable. 
However, no responsibility is assumed by Maple Systems for the use of this information nor
for any infringements of patents or other rights of third parties which may result from its use.  
No license is granted by implication, or otherwise, under any patent or patent rights of Maple 
Systems, Inc.  Maple Systems retains the right to revise or change its products and
documentation at any time without notice.

Содержание HMI5056T

Страница 1: ...Installation Guide 808 134th Street SW Suite 120 u Everett WA 98204u 425 745 3229 www maplesystems com umaple maple systems com 1010 1006 Rev 01 ...

Страница 2: ...h the carrier Save the shipping container and packing material in case the equipment needs to be stored returned to Maple Systems or transported for any reason Warranty Maple Systems warrants each product to be free from electrical and mechanical defects in materials and workmanship for a period of two years from the date of shipment This warranty does not apply to defects in the Products caused b...

Страница 3: ...Installation Guide 3 1010 1006 Rev 01 ...

Страница 4: ...ns that when the OIT is properly mounted to a panel or other enclosure the front enclosure of the OIT will provide protection to the inside of the panel from splashing water wind blown dust rain or hose directed water The OIT must be installed according to the instructions in this manual to be properly sealed Environmental Considerations The Silver Plus Series is designed to operate in temperature...

Страница 5: ...se good grounding procedures during installation sporadic malfunction of the OIT may occur Connect the OIT s chassis ground terminal to a reliable earth ground with a low resistance path Route all earth ground wires that lead from the OIT the PLC the power supply and the line filter to a central earth ground point such as a barrier strip This will ensure that no ground current from one device infl...

Страница 6: ...rth ground If the control panel is metal make sure it is properly grounded Then connect a short heavy gauge wire 18 AWG from the chassis ground terminal of the OIT to a mounting bolt on the control panel door The mounting bolt must have good electrical contact to the control panel scrape away any paint that may be covering the panel to provide a good connection If the control panel is made of a no...

Страница 7: ...T power supply to power switching relays solenoids or other active devices Cable Routing Noise Immunity Follow these guidelines when routing cable to the OIT Always route the OIT communication cable and the power cable away from any AC voltage or rapidly switching DC control lines Never bundle the OIT cables together with 120VAC power wires or with relay wiring Try to keep at least 8 inches 20 cm ...

Страница 8: ... back to the signal return of the power supply Do not use the chassis ground wire as your signal return 4To connect the OIT to power 1 Connect the power cable to the OIT a Strip the power cable shield to expose 2 of the black and red wires b Strip about of insulation from the black and red wires c Thread the black and red wires through the ferrite core The shield wire must be outside d Connect the...

Страница 9: ...clamps and not form a seal with the gasket The area of the panel or mounting surface where the gasket comes into contact must be flat and free of scratches pits and other features that prevent the gasket from sealing properly If the panel or mounting surface is not uniform thick flat stiff or smooth enough then a sealant such as silicone may be required Warning The OIT requires a stiff flat smooth...

Страница 10: ...eyond snugness or you may damage the housing REINSTALLATION Because the gasket will take a set to the panel be sure to reinstall the OIT to the same panel cutout when a NEMA 4 seal is required For best results also replace the gasket itself 10 Silver Plus Series 1010 1006 Rev 01 Screw clamp locking tabs go through the slots Tighten all screw clamps until they are uniformly snug Ends of screws must...

Страница 11: ... switch or router between the PC and the OIT use a straight through or crossover cable as required by the switch or router If an Ethernet port is not available on the PC you may be able to install a USB Ethernet adapter You can also transfer the project to the OIT with a Compact Flash or USB memory device For More Information For information on PLC connection programming and operations of your Sil...

Страница 12: ...12 Silver Plus Series 1010 1006 Rev 01 ...

Страница 13: ...Installation Guide 13 1010 1006 Rev 01 ...

Страница 14: ...14 Silver Series Plus 1010 1006 Rev 01 ...

Страница 15: ...Installation Guide 15 1010 1006 Rev 01 ...

Страница 16: ...16 Silver Series Plus 1010 1006 Rev 01 ...

Отзывы: