
1.
Connection in/out pipes to the boiler
2.
Pipes connection details
3.
General view of the pump correctly installed
3.
1.
2.
(directional valve) to obtain a better result.
In case of excessive foam production, dilute the
acid solution and switch off for a short time the
pump. At the end of the descaling operation,
replace the acid solution inside the pump, with
clean water and rinse the descaled element.
EXPLODED VIEW AND SPARE PARTS
1 -
TANK
2 -
RING NUT
3 -
IMPELLER COVER
4 -
IMPELLER
5 -
O-RING 117,07x3,53 mm
6 -
PLASTIC SCREW M6 x 20 mm
7 -
PUMP BODY
8 -
PLASTIC NUTS
9 -
FLOW INVERTER
10 -
DEVIATOR
11 -
KIT DIRECTIONAL VALVE LEVER
12 -
THREADED PIPE 19x26
13 -
HOSE CONNECTOR 8120 3/4”x19
14 -
MALE NUT 8200 3/4”
15 -
PIPE HOLDER D. 75 mm
16 -
FAIRLEAD FG 216
17 -
FAIRLEAD FG 028
18 -
MOTOR
19 -
ANTI OIL GASKET
LEFT
INVERSION
RIGHT
INVERSION