–72–
Self-Contained Recovery/Evacuation
Place the toggle switch in the OFF position.
Install manifold gauges (with low loss fittings), scale,
and recovery unit or two-stage vacuum pump.
Open (backseat) the high and low side on manifold
gauges.
Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as directed by
the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the system
down to 500 microns. Then, allow the pump to run
for an additional half hour. Turn off the pump and
perform a standing vacuum leak check.
NOTE:
Check for leaks using a halide or electronic
leak detector after charging the ice machine.
Follow the Charging Procedures on the next page.
Содержание UG018A
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank ...
Страница 12: ... 2 This Page Intentionally Left Blank ...
Страница 20: ...10 Evaporator Spray Nozzles Toggle Switch Spray Bar Ice Chute ...
Страница 36: ...26 dip switch Decrease Cube Size Factory Default Setting Increase Cube Size test button ...
Страница 37: ...27 CUBE SHAPE The standard cube has an average weight of 19 Notice the normal dimple in the center of the cube ...
Страница 38: ...28 ...
Страница 80: ...70 This Page Intentionally Left Blank ...
Страница 128: ... 118 This Page Intentionally Left Blank ...
Страница 135: ... 125 ...