CRANE INSTALLATION
NBT40 SERVICE MANUAL
9-4
Published 8-01-2017 Control # 287-11
MOUNTING CONFIGURATIONS
Configuration With Tag Axle 60,000 GVWR (103/127 ft) Boom – NBT40 and NBT45
The mounting configuration (
with tag axle 60,000 lb
GVWR, 103/127 ft boom) shown in Figure 9-2 is based on a
85% stability factor.
The complete unit must be installed on the truck in
accordance with factory requirements, and a test performed
to determine actual stability and counterweight requirements
since individual truck chassis vary.
NOTE:
If bare truck weights are not met, counterweight will
be required.
A summary of mounting and truck requirements are as
follows:
•
Working area 360°
•
Gross Axle Weight Rating (GAWR), front 20,000 lb
•
Gross Axle Weight Rating (GAWR), rear 40,000 lb
•
Gross Vehicle Weight Rating 60,000 lb
•
Gross Tag Axle Rating 10,000 lb (min)
•
Wheelbase (WB) 246 in
•
Tag Axle Location from Front Axle 318 in (min for 60,000
GVWR on bridge law)
•
Frame Section Modulus (SM), front axle to end of AF
30 in
3
•
After Frame (AF) 101 in (min)
•
Minimum truck and tag weight required for stability (truck
with tag axle raised)
-
20,250 lb gross
-
9,450 lb front axle
-
10,800 rear axle
-
Less Weight required if equipped with auxiliary
hoist or additional swinging counterweight.
-
Additional options or heavier bare chassis
weights will require additional axles or a GVWR
in excess of 60,000 lb; in some states special
permits for overload are required.
•
Estimated Final Weight with the following machine
configuration.
NBT40 (Wet) - 57,500 lb and NBT 45 (Wet) - 61,000 lb
-
127 ft Boom, 400 lb 3 part block
-
Steel Decks
-
100 gal fuel and two men in cab
-
Add - 1590 lb for 31/55 ft jib, 1105 lb for aux.
hoist with rooster sheave and 180 lb downhaul
weight.
Figure 9-2 shows the 360° working area that can be
achieved with the front stabilizer (standard on the Series
NBT40). The front stabilizer is essential when extending the
boom and lifting loads over the front of the truck. See “Truck
Frame Strength” section for truck frame strength required for
mounting crane and front stabilizer.
360°full Capacity Working Area
FRONT
STABILIZER
101 MIN
28 MIN
97 MIN
(FOR 42,000 GAWRR
ON BRIDGE LAW)
168 MIN
246 WB
282 APPROX.
C
L
ROTATION
318 MIN
(FOR 60,000 GVWR
ON BRIDGE LAW
TAG Axle
FIGURE 9-2
Reference Only
Содержание National Crane NBT40 Series
Страница 1: ...Service Manual National Crane NBT40 Series R e f e r e n c e O n l y ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 122: ...BOOM MAINTENANCE NBT40 SERVICE MANUAL 4 48 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 136: ...HOIST NBT40 SERVICE MANUAL 5 14 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 162: ...OUTRIGGERS NBT40 SERVICE MANUAL 7 10 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 214: ...CRANE INSTALLATION NBT40 SERVICE MANUAL 9 36 Published 8 01 2017 Control 287 11 7488 4 7488 6 R e f e r e n c e O n l y ...
Страница 216: ...SCHEMATICS NBT40 SERVICE MANUAL 10 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 218: ...NBT40 SERVICE MANUAL APL 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 219: ...R e f e r e n c e O n l y ...
Страница 220: ...R e f e r e n c e O n l y ...