background image

 

K00142 & K00143 STACKING KITS 

                                                                Installation Instructions 

 

1.

 

The K00142 is used for stacking a J/Q-0200, J/Q-0450, J/Q-0600, J/Q-0800, or J/Q-1000 on a Q-0450, Q-0600, Q-0800, or Q-
1000 ice machine.  The K00143 is used for stacking a J/Q-1300 or J/Q-1800 on a Q-1300 or Q-1800 ice machine.  (The Q-series 
ice machine must be on the bottom.) 

Note:

   The bin must be level before proceeding to step 2. 

  

When this kit is used with K00139 or K00170, the water curtain stop bracket must be cut off from the K00139 or K00170 
ice chute. 

2.

 

Installation of ice machines: 
A.

 

See installation manual for uncrating and inspection of both ice machines. 

B.

 

Remove the top cover from the lower ice machine. 

C.

 

Set the ice machine carefully and squarely on the bin. 

D.

 

Remove the two screws that hold the top support angle and replace the support with the one supplied in the kit (K00143 
only). 

E.

 

Remove the two screws from the top right-side frame angle above the control box.  Using the same two screws, install the 
control box shield over the control box with the insulated side down. 

F.

 

Set the top ice machine carefully and squarely on the bottom ice machine. 

G.

 

Remove the front panels from both ice machines. 

H.

 

Attach bottom ice machine to bin using existing screws in bin and ice machine and flat locking brackets from kit. 

I.

 

Drill .156” diameter holes in corner posts, using the locking bracket as a template; attach the locking bracket with four 10-24 
x 1/2 screws supplied. 

J.

 

Attach warning labels from kit, as shown. 

K.

 

Remove the screws that hold on the side panels and attach the trim pieces (supplied in kit) with the four flat head screws 
provided. 

3.

 

Installation of ice chute: 
A.

 

Install the upper ice chute over the top support angle on the lower ice machine, while positioning the lower ice chute below 
it.  Let the upper ice chute rest on the top support angle, as you slide the lower ice chute over it, as shown on front view 
drawing. 

B.

 

To adjust depth of the lower ice chute, insert hook into keyway at level where the lower ice chute does not hang below the 
ice machine base (note, there are two hooks and keyways at the front and back of the stacking kit). 

C.

 

Attach the lower ice chute tab to the bulkhead with the screw provided in the bulkhead.  Attach the chute bracket to the 
bulkhead with the screw provided, as shown on front view drawing. 

D.

 

Check for free movement of both water curtains. 

E.

 

Proceed to ice machine installation manual for electrical and water hook-up and start-up procedure. 

F.

 

Reattach the front panels. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Manitowoc Ice, Inc. 

2110 South 26

th

 Street, P.O. Box 1720, Manitowoc, WI  54221-1720 USA                                                                                                     8011243                     

Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879                                              Sheet 1 of 2 
Web Site - www.manitowocice.com                                                                                                                                                          Rev. 06/17/03 

Отзывы: