SET-UP AND INSTALLATION
TMS800E13 OPERATOR MANUAL
14
Published 02-06-2014, Control # 495-00
2.
Crane should be set up on outriggers using normal
setup procedures (Figure 4-12). Refer to
a.
Fully retract boom.
b.
Lower boom to horizontal for erecting over the front
of the crane.
NOTE:
Tag line is used to control movement of the jib
during erecting procedure.
3.
Attach tag line (1, Figure 4-13) to tip of extension and to
the superstructure.
NOTE:
If erecting the 10.1 m (33 ft) section without the 7 m
(23 ft) section, perform steps 4 and 5, otherwise
proceed to step 6.
4.
If not using the bi-fold 7m (23 ft) section, remove pin (1,
Figure 4-14, photo 6642-8) from the locking bar (2).
Move locking bar (2, photo 6642-9) to the base section
attachment bar (1) and install pin (3). Secure with
retaining pin.
5.
If not using the bi-fold 7m (23 ft) section, remove the
retainer clip and bi-fold stowage pin (1, Figure 4-15) at
the base section connection. Stow pin on bi-fold. Leave
the pin (2) attaching the 7m (23 ft) section to the base
section to retain the 7m (23 ft) section.
.
NOTE:
Steps 6, 7 and 8 apply when erecting the 7m (23 ft)
section together with the 10.1 m (33 ft) section. If
not using the bi-fold 7 m (23 ft) section, proceed to
step 11.
FIGURE 4-12
6645-1
FIGURE 4-13
6645-2
1
6642-8
FIGURE 4-14
1
2
6642-9
2
1
3
6642-41
FIGURE 4-15
1
2
Reference Only
Содержание Grove TMS800E13
Страница 5: ...Operator Manual Grove TMS800E13 R e f e r e n c e O n l y ...
Страница 6: ...R e f e r e n c e O n l y ...
Страница 148: ...SET UP AND INSTALLATION TMS800E13 OPERATOR MANUAL 38 Published 02 06 2014 Control 495 00 R e f e r e n c e O n l y ...
Страница 162: ...LUBRICATION TMS800E13 OPERATOR MANUAL 14 Published 02 06 2014 Control 495 00 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 166: ...OPERATOR MANUAL TMS800E13 APL 2 R e f e r e n c e O n l y ...
Страница 167: ...R e f e r e n c e O n l y ...
Страница 168: ...R e f e r e n c e O n l y ...