5-22
Published 9-04-2014, Control # 422-08
HOIST AND COUNTERWEIGHT
RT765E-2 SERVICE MANUAL
7.
Secure the counterweight to the superstructure with the
two counterweight pin assemblies. To secure each pin
assembly, push it in and turn it so its roll pin engages the
related catch on the counterweight. Then release the pin
assembly so its spring can hold the pin assembly in
place.
8.
Adjust the four counterweight leveling bolts Figure 5-13
to eliminate any relative movement between the
counterweight and the turntable.
9.
The crane is now ready for operation with the
counterweight installed.
FIGURE 5-13
Bolt
Reference Only
Содержание Grove RT765E-2
Страница 1: ...Service Maintenance Manual Grove RT765E 2 R e f e r e n c e O n l y ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 278: ...UNDERCARRIAGE RT765E 2 SERVICE MANUAL 8 24 Published 9 04 2014 Control 422 08 FIGURE 8 28 R e f e r e n c e O n l y ...
Страница 320: ...LUBRICATION RT765E 2 SERVICE MANUAL 9 30 Published 9 04 2014 Control 422 08 FIGURE 9 12 102 R e f e r e n c e O n l y ...
Страница 326: ...LUBRICATION RT765E 2 SERVICE MANUAL 9 36 Published 9 04 2014 Control 422 08 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 329: ...R e f e r e n c e O n l y ...
Страница 330: ...R e f e r e n c e O n l y ...