SET-UP AND INSTALLATION
GRT8120 OPERATOR MANUAL
17.
Install four pins (5, Figure 5-39) and retaining clips (6) to
secure the boom extension to the boom nose. If
necessary, use the jack (1, Figure 5-68) to install the
fourth pin:
a.
Install three pins to attach the boom extension to the
boom nose.
b.
Operate the jack handle (2) to align the holes on the
boom extension with the hole in the boom nose.
c.
Install the fourth pin. Secure the fourth pin with
retaining clip.
d.
Turn the nob (3) to relieve the pressure to retract the
jack pin.
18.
Connect boom extension electrical connectors. For
more information, see
19.
If erecting a hydraulic boom extension, connect
hydraulic hoses. For more information, see
20.
Raise the mast sheave assembly. For more information,
see
21.
Reeve the hoist rope. For more information, see
22.
Remove the anti-two block switch from the main boom
nose. For more information, see
, page 5-10. Install anti-two block switch on the
end of the boom extension. For more information, see
Anti-Two Block Switch on the Boom Extension
23.
(Optional) Install the anemometer and boom position
light assembly. For more information, see
Boom Position Light (Optional)
Stowing the 10.5 m (34.5 ft) Boom Extension
Base Section Only
Use the following procedure to stow the boom extension
base section to the side of the main boom.
NOTE:
This procedure assumes only the boom extension
base section is erected and the fly section is
secured to the side of the main boom.
NOTE:
The boom extension base section cannot be
stowed if the fly section is not first stowed on the
side of the main boom.
1.
Make sure the crane is set up on fully extended
outriggers. For more information, see
2.
Make sure the counterweight is installed. For more
information about installing the counterweight, see
Counterweight Removal and Installation
3.
Fully retract and lower the boom to horizontal.
4.
(Optional) Remove the anemometer and boom position
light assembly. For more information, see
Boom Position Light (Optional)
5.
Remove the anti-two block switch from the end of the
boom extension. For more information, see
Block Switch on the Boom Extension
the anti-two block switch on the auxiliary boom nose. For
more information, see
6.
Remove the hoist rope from the boom extension base
section sheaves. For more information, see
CAUTION
After installing the fourth pin, turn the pressure relief nob
(3) to retract the jack so the jack does not contact the
boom nose. Failure to retract the jack could result in
damage to the boom extension jack.
FIGURE 5-68
1
3
2
9914
DANGER
Boom Extension Hazard!
To avoid death or serious injury, follow procedures and
cautions in the Operator and Safety Manuals and decals
during erection, stowage and use of boom extension.
Install and secure all pins properly and control boom
extension movement at all times.
Содержание Grove GRT8120
Страница 1: ...Operator Manual Grove GRT8120 ...
Страница 4: ...THIS PAGE BLANK ...
Страница 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Страница 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 74: ...SAFETY INFORMATION GRT8120 OPERATOR MANUAL 2 50 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 182: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 52 Published 3 22 2021 Control 702 02 FIGURE 4 54 ...
Страница 184: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 54 Published 3 22 2021 Control 702 02 FIGURE 4 55 1a 1b 1c 1d 1e 1f ...
Страница 186: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 56 Published 3 22 2021 Control 702 02 FIGURE 4 56 1a 1b 1c 1d 1e 1f 1g ...
Страница 188: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 58 Published 3 22 2021 Control 702 02 FIGURE 4 57 ...
Страница 190: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 60 Published 3 22 2021 Control 702 02 FIGURE 4 58 ...
Страница 221: ...Grove Published 3 22 2021 Control 702 02 4 91 GRT8120 OPERATOR MANUAL OPERATING PROCEDURES 4 THIS PAGE BLANK ...
Страница 378: ...5 70 Published 3 22 2021 Control 702 02 SET UP AND INSTALLATION GRT8120 OPERATOR MANUAL THIS PAGE BLANK ...
Страница 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 447: ......
Страница 448: ......