![Manitowoc Grove GRT8120 Скачать руководство пользователя страница 315](http://html.mh-extra.com/html/manitowoc/grove-grt8120/grove-grt8120_operators-manual_701202315.webp)
Grove
Published 3-22-2021, Control # 702-02
5-7
GRT8120 OPERATOR MANUAL
SET-UP AND INSTALLATION
5
RCL Light Tower (Optional)
The RCL Light Tower (1, Figure 5-6) is an optional feature
located on the front right of the crane cab. It must be
retracted for transport and extended for operation.
Retracting the RCL Light Tower for Transport
1.
Remove retaining clip (2) and pin (3) from the mounting
bracket (4).
2.
Slide the RCL light tower down to the retracted position.
Align the retract position hole (5) in the tower post with
the hole in the mounting bracket.
3.
Install the pin (3) in the mounting bracket (4) and tower
post. Secure the pin with the retaining clip (2).
Extending the RCL Light Tower for Operation
1.
Remove the retaining clip (2) and pin (3) from the
mounting bracket (4).
2.
Slide the RCL light tower (1) up to the extended position.
Align the extend position hole (6) in the tower post with
the hole in the mounting bracket (4).
3.
Install the pin (3) in the mounting bracket (4) and tower
post. Secure the pin (3) with the retaining clip (2).
1
FIGURE 5-6
3
2
4
5
Working Position
Transport Position
6
9939
9940
9941
Содержание Grove GRT8120
Страница 1: ...Operator Manual Grove GRT8120 ...
Страница 4: ...THIS PAGE BLANK ...
Страница 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Страница 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 74: ...SAFETY INFORMATION GRT8120 OPERATOR MANUAL 2 50 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 182: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 52 Published 3 22 2021 Control 702 02 FIGURE 4 54 ...
Страница 184: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 54 Published 3 22 2021 Control 702 02 FIGURE 4 55 1a 1b 1c 1d 1e 1f ...
Страница 186: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 56 Published 3 22 2021 Control 702 02 FIGURE 4 56 1a 1b 1c 1d 1e 1f 1g ...
Страница 188: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 58 Published 3 22 2021 Control 702 02 FIGURE 4 57 ...
Страница 190: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 60 Published 3 22 2021 Control 702 02 FIGURE 4 58 ...
Страница 221: ...Grove Published 3 22 2021 Control 702 02 4 91 GRT8120 OPERATOR MANUAL OPERATING PROCEDURES 4 THIS PAGE BLANK ...
Страница 378: ...5 70 Published 3 22 2021 Control 702 02 SET UP AND INSTALLATION GRT8120 OPERATOR MANUAL THIS PAGE BLANK ...
Страница 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 447: ......
Страница 448: ......